unicore HPL EVK5.0 Installation And Operation User Manual Download Page 8

HPL EVK5.0 CD-Kit User Manual 

UC-00-E60 EN R1.1 

Connection 

 

COM1 to COM3 can be set up as a straight-through or crossover connection 
through a jumper cap near the DB9 interface. The jumper cap is installed parallel to 
DB9 as a crossover and perpendicular to DB9 as a straight-through connection. 

 

If the board to be tested needs a backup power, weld a 0 Ω resistor R118. 

3

 

Connection   

This section takes UM980 as an example to give an introduction of how to evaluate the 

modules or boards using the EVK. 

 

Electrostatic discharge (ESD) may cause damage to the device. All 

operations mentioned in this chapter should be carried out on an antistatic 

workbench using an antistatic wrist strap and conductive foam pad. If there is 

no antistatic workbench, wear an antistatic wrist strap and connect the other 

end of the strap to the metal frame to avoid electrostatic damage. 

 

Hold the edge of the evaluation board, and do NOT touch the components 

directly. 

Carefully check the EVK to make sure that there is no apparent loose or damaged 

components. If you have any questions, please contact Unicore or the local distributors. 

Do the following steps to evaluate. 

1.

 

Ensure adequate antistatic measures, such as wearing a grounded antistatic wrist 

strap, using a grounded workbench, etc. 

2.

 

Connect the RF cable to the ANT interface on UM980eb. 

 

Figure 3-1    Connection 

 

Summary of Contents for HPL EVK5.0

Page 1: ...WWW UNICORECOMM COM Copyright 2009 2023 Unicore Communications Inc Data subject to change without notice High Precision Products Evaluation Kit EVK INSTALLATION AND OPERATION USER MANUAL...

Page 2: ...HPL EVK5 0 CD Kit User Manual i Revision History Version Revision History Date R1 0 First release Mar 2023 R1 1 Add a note to RS232 to USB cable Add Appendix Dec 2023...

Page 3: ...mplied by estoppel or any other form the granting or transferring of Unicore rights and or interests including but not limited to the aforementioned trademark rights in whole or in part Disclaimer The...

Page 4: ...5 0 CD Kit User Manual iii Foreword This document provides information about the HPL EVK5 0 CD Kit from Unicore Target Readers This document applies to technicians who possess the expertise on GNSS re...

Page 5: ...I Contents 1 OVERVIEW 1 2 INTERFACE 2 3 CONNECTION 3 APPENDIX DIMENSIONS 4...

Page 6: ...the function and performance of Nebulas modules1 and boards from Unicore for the convenience of users Figure 1 1 shows the items in the package box 1 2 3 4 Figure 1 1 Package List 1 EVK 2 Power Adapte...

Page 7: ...ply switch Turn to the right to supply power 3 COM1 Connect to COM1 of the board to be tested 4 COM3 Connect to COM3 of the board to be tested 5 COM2 Connect to COM2 of the board to be tested 6 RJ45 E...

Page 8: ...ns mentioned in this chapter should be carried out on an antistatic workbench using an antistatic wrist strap and conductive foam pad If there is no antistatic workbench wear an antistatic wrist strap...

Page 9: ...o the electrical socket 8 Select the GNSS antenna with appropriate gain the system frequency supported by the antenna should be consistent with the module fix it in a non occluded area and connect the...

Page 10: ...HPL EVK5 0 CD Kit User Manual UC 00 E60 EN R1 1 Appendix Dimensions 5 107 95 180 34 172 72 100 33 3 81 3 81 3 30 X 4 HPL EVK5 0 CD Kit...

Page 11: ...Unicore Communications Inc 7 F3 No 7 Fengxian East Road Haidian Beijing P R China 100094 www unicorecomm com Phone 86 10 69939800 Fax 86 10 69939888 info unicorecomm com www unicorecomm com...

Reviews: