Unicont SPb Ltd
Installation Manual MV-1901F
Page
9
5.
Installing and connecting the display
The display is installed and connected in the following sequence:
1.
Insert the frame with LCD display into rack radar in place of CRT dismantled
(Figure 12).
Figure 12. Mounting display into radar rack
IMPORTANT!
If necessary, shorten (cut away) fastening bolts of CRT fixing it to
radar rack.
IMPORTANT!
Do not tighten the frame bolts up to the end of connecting cables to the
display.
2.
Fix the bracket with switching card on the inner part of the left-hand side of radar
rack (Figure 13).
Mounting points
fixing switching
card to radar rack
Figure 13. The location of switching card (on the left), general view of switching card
in radar rack (on the right)
Connecting LCD display
LCD display is connected in the following sequence (also see Table 1, Figure 16):
3.
Insert control cable (14-conductor ribbon cable) coming out from the hole (on the
back side) of LCD-display housing into J1 connector of the switching card (Fifure 14,
Figure 15).