01865 767676
www.unicol.com
3
Revised 08/12/23
1
2
3
1
2
3
SBM1 / SBM9
Each style can be mounted with the devices above
or below the screen. Hook the assembled bracket
over the rail of the PZX screen mount back plate.
1
Adjust the horizontal positioning to suit, then tighten
the screws underneath to secure into position.
2
SBM & SBT GENERAL ASSEMBLY INSTRUCTIONS
Connect your device to mount plate
3
. Each mount
is dedicated to your device so may vary from the
image above.
Connect rails
2
to mount unit
1
. To adjust sound bar
height, simply fix in the slots that best suit.
Connect the mount plate
3
to the bottom of the rails
2
.
Next, follow either SBM1/SBM9 or SBT step.
SBC
1. Designed to fit to suspended columns from a
ceiling mount. Each mount plate
1
is dedicated to your
device so the brackets holes will align with those
situated on your device.
2. Remove through-bolt and loosen grub screws in
socket. Align fixing holes in socket and column and
fix with through-bolt. Tighten grub screws to finish.
SBT
The SBT fixes to the 4x 150x150mm centre holes on
the mast of some stands/trolleys. In some cases, this
may include a span bar unit. In this instance, screens
will need removing along with the bottom two fixings.
Loosen the top two fixings and slot the SBT tear-drop
holes over the bolts
1
. Line up the bottom two holes,
and secure fixings into place
2
. Tighten all fixings.
1
2
1
1
1
2
SBM
SBT
2