
01865 767676
www.unicol.com
3
Revised 15/09/22
STEP 1
Using the 4 mounting slots cut out on the ceiling
plate, determine where you want to install, mark it
and fix into position. If fixing to a slanted ceiling,
adjust the angle of the body by loosening the
screws at the side, levelling and tightening again.
Please consider cabling and fixings prior to
installation. Please check surface can support 5x
the combined solutions weight.
STEP 2
Fix the Universal plate and telescopic section to
the projector using the screws provided. Adjust
arm lengths (2) by loosening the knurled screws
(3) to enable fixing screws to locate into projector
fixing holes. Level the Universal plate against
the projector by screwing up or down the hollow
screws (1). Once in position, centralise the mount
and tighten all screws.
STEP 3
Join the 2 parts of the GKU1 together by sliding the
bottom half into the top half and fix using the dome
headed allen screws. Adjust the telescopic section
as required and fully tighten screws.
STEP 4
Using the pan, tilt and screen levelling functions
adjust the projector alignment. Finally tighten all
dome headed screws using the allen key provided.
1
2
3
STANDARD