16
3.3 - PACKAGING
XC-K 3
boilers are supplied complete with the door
and smoke chamber assembled, while the casing
and insulation are included in separate cardboard
packs.
Before starting installation, make sure that the length and width
of the boiler body received correspond respectively to the di-
mensions L
and W of the boiler you have ordered
The casing of boilers complete with insulation mattresses, is
contained in boxes.
Boxes
n.3
XC-K 3 1000
n.3
XC-K 3 1250 - 1500
n.3
XC-K 3 1750 - 2000
n.4
XC-K 3 2500 - 3000
The control panel is optional and if required it is packed with its
own cardboard and placed inside the furnace,
as accessories positioned inside thefurnace you will also find:
1 box containing hydraulic connection flanges, with
relative gaskets and bolts (where included).
- ceramic fibre cord to insulate between burner blast tube and
door.
Keep the packaging material (plastic bags, etc.) out of the reach
of children as they are potential sources of danger.
unical will not be held liable for damage to persons,
animals or objects due to failure to comply with the
above instruction.
Inside the furnace is contained:
Pouch with the following documentation:
- manager operating instructions booklet
- Instruction booklet for the installer and maintenance
engineer
- 2 Spare parts form
- Certificate of conformity
- Testing certificate
Accessories box containing:
- 5 bends + a T + a plastic condensate draining cap
- Condensate drain siphon pipe 1 m.
- Protect all parts against impacts if they are
to be transported.
OBLIGATION!
wear protective gloves
3.3.1 - handling
The boiler must be handled by lifting by the upper
hooks, or by translation with rollers placed under
the sturdy base side.