UTL8200 User Manua
11
Three-core power cable is provided; please make sure that the ground wire of the
three-phase socket is properly grounded before use.
The instrument comes with 220V/110V power transfer switch. Before powering on,
please ensure that the switch is in the correct position.
250V/0.25A (5x20mm) fuse is selected and installed for the instrument (220V).
In addition, 2 spare fuses of 250V/0.5A are provided for input voltage of AC 110V.
When replacing the fuse, please unplug the external power cable first, then open the
fuse slot under the power interface, take out the old fuse and replace it with a new
one, and install the fuse slot back after completion.
Warning:
Please do not use the damaged power cable to avoid danger. Use the
250V/0.5A fuse when 110V AC power is input.
2.3 Operating Environment
The operating environment requirements are listed as follows. During the on-load process,
the speed of the cooling fan will be intelligently adjusted based on the change of the
cooling fin’s temperature.
Operating environment
Requirements
Operating temperature
0°C~40°C
Operating humidity
20%~80% (Non-condensing)
Storage temperature
-10°C~60°C
Altitude
≤2000m
Degree of pollution
II
2.4 Cleaning
To avoid electric shock, please unplug the power cable before cleaning.
Clean the housing and the panel with a soft damp cloth, and make sure it is completely dry.
Do not clean the inside of the instrument.
Warning:
Do not use solvents such as alcohol and gasoline.
3. Measurement Display Interface
Power on and Run
Measurement Interface