14
Leakage Test
5. After the unit has completed the insulation test it will automatically proceed to
the leakage test.
If the measured leakage is less than 0.25mA, the meter will display “
√
ILeak”
as a PASS rating.
If the measured leakage is greater than 0.25mA, it will display “× ILeak” as a
FAIL.
Final Result - Class 2
After the above tests are completed, the meter will indicate whether the
appliance has Passed or Failed the Class 2 test.
Testing an IEC Lead / Extension Lead / Cord Test
Plug the mains lead under test into the socket and the front panel mains socket
on the unit as shown in Diagram 5.