background image

Full product range & more information: 

www.lumenalights.com

 

 

INSTALLATION:

 

 

IMPORTANT: Cable should be laid inside armoured conduit or piping to protect from water-logging, chemicals 
found in soil and damage. If buried, it should be buried to at least 0.5m below ground to reduce damage risk. If 

this method is not used, cable warranty will be void. 

 

This bollard should be securely fixed to a concrete base, brick, paving slab or quality wooden decking. It should not be installed 

directly into soil.  

 

1.

 

Remove internal mounting base from the bollard body by removing the 3 x 
socket screws. 

2.

 

Drill out the 3 mounting holes using a 6mm masonry drill bit and insert the 

plastic wall plugs (supplied). 

3.

 

Locate and remove the connection block from inside the tube and insert the 
cable into the waterproof junction box, as well as the mains cable. 

4.

 

Strip back the 3 inner wires of the mains power cable to reveal the Live 
(brown), Earth (yellow & green) and Neutral (blue).  

5.

 

Insert the wires into the correct terminals of the terminal block, ensuring the 
two brown Live wires (L) are connected to one another, the two blue 
Neutral wires (N) are connected to one another and the two yellow and 

green Earth wires are connected to one another 

 See diagram. 

6.

 

Fully tighten the terminal block screws to clamp the wires down, ensuring 
they make a connection to the conductor, not the rubber sheath.  

7.

 

Once the wiring is complete, ensure the junction box is sealed / fully water 
right, and return back inside the post.  

8.

 

Insert the stainless steel bolts through the mounting plate and secure in place 

(adjust base as required 

 see below). 

9.

 

Replace the tube over the base and fasten the 3 x socket screws to secure.  

 

 

 

  

 

ADJUSTABLE MOUNTING BASE: 
 

The Pathos 316 incorporates a unique adjustable mounting base plate which enables installation 
on uneven surfaces. 

 

1.

 

Loosen the socket screws on the mounting base with the allen key provided. 

2.

 

Loosely secure the base to the surface as per above. 

3.

 

Using a spirit level, adjust the socket screws accordingly to level off the base. 

4.

 

Fully tighten the mounting screws to complete installation. 
 

 
 
 
 
LAMP INSTALLATION / REPLACEMENT:

     

(Ensure power is turned off prior to changing the lamp)

 

 

1.

 

Unscrew the head to reveal bulb holder. 

2.

 

Remove / Insert lamp (screw base 

 E27). 

3.

 

Replace head and turn until head becomes secure on the fitting. 
 

 
 

IMPORTANT:

 Condensation can occur due to the warmth inside the fitting produced by the lamp and the cold air outside. If 

this is noticed, on a dry day, turn off the power supply, safely remove the head, and wipe dry with a soft cloth. It is 
recommended to change lamps / install on a warm, dry day. 

 

Light 

Fitting 

N

 

 

L

 

Live 

Cables 

Earth  

            

Cable 

Mains  

Power 

Cable 

Neutral 

Cables 

Earth Cable 

CABLES:

  

Neutral (N) = Blue 
Live (L) = Brown 
Earth   = Yellow & Green 
 
Colours  of  wire  sleeving  may  vary 
slightly 

 Test prior to use. 

Reviews: