1.
Carefully place the
Ultimaker S5 on top of
the Material Station
Install the Material Station
The Ultimaker S5 should be lifted by at least two people during installation.
2.
Insert a tube coupling
collet in the bottom
of each feeder of
the Ultimaker S5
3.
Insert the left Bowden
tube into the left
feeder, and the right
Bowden tube into
the right feeder
4.
Secure the Bowden
tubes with clamp clips
5.
Place the spool holder
cap into the hole for
the spool holder of
the Ultimaker S5
6.
Connect the Material
Station cable to the
UMB IN
port at the back
of the Material Station
Power off the Ultimaker S5 and remove the power cable, spool holder, and materials
during installation.
Summary of Contents for S5 Material Station
Page 7: ...EN...
Page 13: ...CS...
Page 19: ...DA...
Page 25: ...DE...
Page 31: ...ES...
Page 37: ...FI...
Page 43: ...FR...
Page 49: ...IT...
Page 55: ...HU...
Page 56: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2 2 Material Station...
Page 61: ...JA...
Page 62: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2 2 Material Station...
Page 67: ...KR...
Page 73: ...NL...
Page 79: ...NO...
Page 85: ...PL...
Page 91: ...PT...
Page 92: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2 2 Material Station...
Page 97: ...RU...
Page 103: ...SV...
Page 109: ...TR...
Page 110: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2 2 Material Station...
Page 115: ...ZH S...
Page 116: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2x 2x Material Station...
Page 121: ...ZH T...
Page 123: ...Ultimaker S5 Material Station Ultimaker S5 Material Station 2x 2x Material Station AR...
Page 127: ...AR...
Page 128: ......