![Ulma LAMBDA Installation And Maintenance Manual Download Page 3](http://html.mh-extra.com/html/ulma/lambda/lambda_installation-and-maintenance-manual_835661003.webp)
3
Information
• Keep this manual so that it is accessible to professionals and future needs.
• Read this manual carefully before starting up the boiler.
• The efficiency of the boiler is calculated after the maximum amount pellets that can be fed and
combusted in the burner during 1 hour (intended for combustion of normal wood pellets as an
average of the fuel specification).
• Follow the manual and its instructions carefully do recommended management and maintenance.
Registration to the local building authority in your municipality
N.B.: At every change of heating system, the local building authority of the municipality has to be
contacted and a so called “Construction Registration” is made.
Inspection
Heating plants installed today shall be inspected and approved by authorized inspector like the local
certified chimney-sweeper. The local building authority in the municipality can inform you how this
could work.
Important at installation
• Make sure expansion and cold water connection are correctly mounted, if you are unsure you may
control this by looking down in the connection pipes. The long pipe reaching down towards the
bottom of the boiler is cold water and the short expansion connection. The pipe connections are
placed behind the connection of the shunt valve. (See connection schedule on page 5-6.)
• Make sure that boiler and heating system is water filled and de-aerated before starting the
combustion.
• Installation shall be made by certified ventilation and sanitation engineer and electrician.
• At operation with burner: Set the thermostat so that the immersion heater will be connected at
unintentional interruptions in operation of the burner.
•.
N.B.!
The burner shall be inserted to maximum in the boiler. Control this carefully in the future also
if the burner is disconnected for example cleaning and service.
• At adjustment of the burner draw limiter shall be adjusted after the draft condition of the chimney. .
• The boiler shall be connected electrically via an all-pole breaker with at least 3 mm length of break.
• The room giver should be on level zero when the boiler is put into operation, when the boiler then is
filled with water and reached maximum temperature the giver should be turned up to approx. 25
degrees so that a click is heard in the giver and then turned back to desired indoor temperature. By
doing this you activate (start) the circulation pump.
Sweeping
Chimney sweeping made in accordance with the fire-protection law shall be made frequently during
the year. This is made by your local chimney sweeper. Regular cleaning of heating surface of the
boiler shall be made in a way so that good operating economy is obtained. Prepare sweeping by
turning off the boiler at least a couple of hours before cleaning to minimize the amount of ignited ash.
Warning!
See to that the power to the boiler is turned off before the cap over the burner is removed and
dismount cabling to the burner when the burner is removed from the boiler.
Maintenance agreement increases operation length and life of the unit
ULMA AB recommends subscription of annual maintenance agreement.
For more information contact your local ULMA retailer.
Change of wear parts
ULMA AB always recommends that wear parts, when needed, are being changed by an authorized
service technician at your ULMA retailer. ULMA’s retailers can provide necessary spare parts and at
change make sure that the part being changed on the unit go through alignment and that a flue-gas
analysis of the unit is made.