Step2

.

Lift one side of the tent frame and attach the legs (3). Place the roof (15) onto the frame and use the long

bungees (9) to fasten it.

Be sure not to put too much tension on the bungees in order not to make attaching the other side more difficult.

Step 3.

Attach the legs on the other side. Make sure, that the leg pipes are in vertical position, to avoid overtention

on the end walls. Use the long ground pegs (7) to fasten the feet to the ground. Attach the side covers to the pipes (4)
using hooks (13).

Summary of Contents for ECONOMY Prime 4m Series

Page 1: ...you secure your tent properly with storm straps and ground pegs when you put up the structure Proper Anchoring system selection is your responsibility Heavy duty Anchor are sold separately and are not included in this product Periodically check the anchors to ensure stability of shelter In case of extreme weather conditions the tent cover must be removed Any shelter that is not anchored securely h...

Page 2: ...oved from the tarpaulin in a timely manner Temporary accommodation as tents should be taken down in adverse weather condition like heavy wind snowfall and ice Ensure sufficient distance of the tarpaulin to heat sources electrical gas and other pipes min 1 2m You can obtain detailed information from your responsible authority Pay attention to the following points when choosing a location The pavili...

Page 3: ...arts on the ground as shown below 2 meter per section e g 4x4m has 2 sections 4x6m has 3 sections 4x8m has 4 sections 4x10m has 5 sections and 4x12m has 6 sections Assemble the roof frame by mounting parts 4 and 5 on the pipes parts 1 2 Use the bolts 12 to attach the parts ...

Page 4: ...t Be sure not to put too much tension on the bungees in order not to make attaching the other side more difficult Step 3 Attach the legs on the other side Make sure that the leg pipes are in vertical position to avoid overtention on the end walls Use the long ground pegs 7 to fasten the feet to the ground Attach the side covers to the pipes 4 using hooks 13 ...

Page 5: ...tach the side walls to the frame using the bungees 9 Attach the end walls directly to the roof using the short bungees 10 Use the short ground pegs 8 to fasten the end walls to the ground The guy rope runs from every corner of the tent and is braced to the ground using the spiral pegs 6 ...

Page 6: ...4m series ECONOMY Prime 6 Parts List Quantity Item Design 4x4m 4x6m 4x8m 4x10m 4x12m 1 Pole 2112mm 6 8 10 12 14 ...

Page 7: ...tor 5 3 6 9 12 15 6 Spiral peg 4 4 4 4 4 7 Long peg 6x180mm 6 8 10 12 14 8 Short peg 4x180mm 22 28 34 40 46 9 Long bungee 66 84 102 120 138 10 Short bungee 18 18 18 18 18 11 Guy rope 3m 4 4 4 4 4 12 Bolt with wing nut 30 42 54 66 78 13 Hook 6 8 10 12 14 14 Spanner 1 1 1 1 1 15 Roof 1 1 1 1 1 16 Side wall 4 6 8 10 12 ...

Page 8: ...4m series ECONOMY Prime 8 17 End wall 2 2 2 2 2 ...