UES AG · Breuershofstr. 48 · 47807 Krefeld · Germany
Tel.: 0049-2151-72950 · Fax: 0049-2151-729578 ·
· www.ues-ag.net
10
Installation
Checking the components
After unpacking, please check all the components of your
perfect
Melt
and (if applicable) the hot glue
hoses and application heads for any damage.
If you notice any damage, please contact UES AG immediately.
perfect
Melt parts list
perfect
Melt
system
Manual
Filter wrench
Assembly and mounting of the tank system
Warning!
To prevent injury caused by falling, the tank system has to be firmly screwed
together with the production machine in any case.
The tank system is equipped with two mounting brackets. These angles have 9 mm holes to secure the
tank system with M8 bolts to the production machine. For this purpose, holes that are about 9 mm in
diameter have to be drilled in the seat for the tank system of the production machine.
The tank system should be positioned so that an operator is not ergonomically impaired. This particularly
applies to settings on the control panel, filling the tank and maintenance work, such as filter changes.
Warning!
Please make sure that, when drilling holes, no cables,
pipes or other equipment installations are damaged!