background image

PRO-MIC Strip Profiling Workstation

The hydraulic pressure gauge 
needs to be re-installed in the 
plumbing.  First, remove the factory 
installed plug then carefully mount 
the gauge.

Step 4:

Select your power supply voltage on 
the rear of the Charger/Interface.

Connect the Charger/Interface to the 
power supply.

Connect the W1-G cable (male) to 
the Charger/Interface. 

Step 5:

Connect the W1-G cable (female) to 
the PRO-MIC electronics.

The PRO-MIC may start automatically, if 
not press Start/Stop to start the PRO-MIC.

Basic Setup is complete.

Your PRO-MIC is Ready!

If PRO-MICs Visual Quantum PC software 
is to be used, please follow the 
instructions supplied with the software to 
connect the PRO-MIC to the 
charger/interface and the 
charger/interface to your PC.

Step 6:

Assembly and Connection

Reviews: