PRO-MIC Strip Profiling Workstation
The hydraulic pressure gauge
needs to be re-installed in the
plumbing. First, remove the factory
installed plug then carefully mount
the gauge.
Step 4:
Select your power supply voltage on
the rear of the Charger/Interface.
Connect the Charger/Interface to the
power supply.
Connect the W1-G cable (male) to
the Charger/Interface.
Step 5:
Connect the W1-G cable (female) to
the PRO-MIC electronics.
The PRO-MIC may start automatically, if
not press Start/Stop to start the PRO-MIC.
Basic Setup is complete.
Your PRO-MIC is Ready!
If PRO-MICs Visual Quantum PC software
is to be used, please follow the
instructions supplied with the software to
connect the PRO-MIC to the
charger/interface and the
charger/interface to your PC.
Step 6:
Assembly and Connection