Ubiquiti NanoBeam M5-16 Quick Start Manual Download Page 13

17.02.2020

NBE-M5-16 Qu ck Start Gu de

https://dl.ubnt.com/qsg/NBE-M5-16/NBE-M5-16_EN.html

13/16

Safety Not ces

1. Read, follow, and keep these  nstruct ons.
2. Heed all warn ngs.
3. Only use attachments/accessor es spec f ed by the manufacturer.

WARNING:

 Do not use th s product  n locat on that can be submerged by water.

WARNING:

 Avo d us ng th s product dur ng an electr cal storm. There may be a remote

r sk of electr c shock from l ghtn ng.

Electr cal Safety Informat on

1. Compl ance  s requ red w th respect to voltage, frequency, and current requ rements  nd cated

on the manufacturer’s label. Connect on to a d fferent power source than those spec f ed may

result  n  mproper operat on, damage to the equ pment or pose a f re hazard  f the l m tat ons

are not followed.

2. There are no operator serv ceable parts  ns de th s equ pment. Serv ce should be prov ded only

by a qual f ed serv ce techn c an.

3. Th s equ pment  s prov ded w th a detachable power cord wh ch has an  ntegral safety ground

w re  ntended for connect on to a grounded safety outlet.

a. Do not subst tute the power cord w th one that  s not the prov ded approved type. Never

use an adapter plug to connect to a 2-w re outlet as th s w ll defeat the cont nu ty of the

ground ng w re.

b. The equ pment requ res the use of the ground w re as a part of the safety cert f cat on,

mod f cat on or m suse can prov de a shock hazard that can result  n ser ous  njury or death.

c. Contact a qual f ed electr c an or the manufacturer  f there are quest ons about the

nstallat on pr or to connect ng the equ pment.

d. Protect ve earth ng  s prov ded by L sted AC adapter. Bu ld ng  nstallat on shall prov de

appropr ate short-c rcu t backup protect on.

e. Protect ve bond ng must be  nstalled  n accordance w th local nat onal w r ng rules and

regulat ons.

L m ted Warranty

u .com/support/warranty

The l m ted warranty requ res the use of arb trat on to resolve d sputes on an  nd v dual bas s, and,

where appl cable, spec fy arb trat on  nstead of jury tr als or class act ons.

Compl ance

FCC

Changes or mod f cat ons not expressly approved by the party respons ble for compl ance could

vo d the user’s author ty to operate the equ pment.
Th s dev ce compl es w th Part 15 of the FCC Rules. Operat on  s subject to the follow ng two

cond t ons.

NBE-M5-16 Qu ck Start Gu de

Summary of Contents for NanoBeam M5-16

Page 1: ...table fastener such as a screw or bolt not ncluded s requ red 7 mm socket wrench or screwdr ver for pole mount ng Wall fastener for wall mount ng Sh elded Category 5 or above cabl ng should be used f...

Page 2: ...on for more than 10 seconds wh le the dev ce s powered on Alternat vely the dev ce may be reset remotely v a a Reset button located on the bottom of the PoE Adapter The Ethernet port s used to connect...

Page 3: ...rce The Ethernet LED w ll l ght steady blue when an act ve Ethernet connect on s made and ash when there s act v ty In a rOS you can mod fy the w reless s gnal strength threshold values for each LED o...

Page 4: ...17 02 2020 NBE M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 4 16 3 4 Wall Mount ng NBE M5 16 Qu ck Start Gu de...

Page 5: ...other structurally stable surface to avo d damage to the mount ng hole when you adjust the a m Opt onal Accessory To enhance stab l ty you can use the NanoBeam Wall Mount K t model NBE WMK sold separa...

Page 6: ...17 02 2020 NBE M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 6 16 3 Fastener not ncluded OR NanoBeam Wall Mount K t 4 NBE M5 16 Qu ck Start Gu de...

Page 7: ...17 02 2020 NBE M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 7 16 A m ng 1 2 NBE M5 16 Qu ck Start Gu de...

Page 8: ...17 02 2020 NBE M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 8 16 Connect ng Power 1 2 NBE M5 16 Qu ck Start Gu de...

Page 9: ...17 02 2020 NBE M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 9 16 3 4 NBE M5 16 Qu ck Start Gu de...

Page 10: ...he dev ce 2 Conf gure the Ethernet adapter on your host system w th a stat c IP address on the 192 168 1 x subnet 3 Launch your web browser and type https 192 168 1 20 n the address f eld Press enter...

Page 11: ...load a rmax m You can also manage your dev ce us ng the Ub qu t Network Management System Setup us ng the UNMS app requ res the U Installer sold separately Installer Compl ance Respons b l ty Dev ces...

Page 12: ...4 N 200 km h 4 8 lbf 125 mph W nd Surv vab l ty 200 km h 125 mph Mount ng Pole Mount K t Included Wall Mount Salt Fog Test IEC 68 2 11 ASTM B117 Equ valent MIL STD 810 G Method 509 5 V brat on Test I...

Page 13: ...ubst tute the power cord w th one that s not the prov ded approved type Never use an adapter plug to connect to a 2 w re outlet as th s w ll defeat the cont nu ty of the ground ng w re b The equ pment...

Page 14: ...ccept any nterference nclud ng nterference that may cause undes red operat on of the dev ce Th s rad o transm tter has been approved by ISED Canada The dev ce for operat on n the band 5150 5250 MHz s...

Page 15: ...ota Este equ pamento n o tem d re to prote o contra nterfer nc a prejud c al e n o pode causar nterfer nc a em s stemas dev damente autor zados CE Mark ng CE mark ng on th s product represents the pro...

Page 16: ...M5 16 Qu ck Start Gu de https dl ubnt com qsg NBE M5 16 NBE M5 16_EN html 16 16 WEEE Compl ance Statement Declarat on of Conform ty Onl ne Resources 2020 Ub qu t Inc All r ghts reserved NBE M5 16 Qu...

Reviews: