background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A Top 

Connection 

 

 

Q Hook 

 

Beam for big 

roof 

 

R Small 

canopy 

 

C Long 

beam 2 

S Large 

canopy 1 

D Short 

beam 2 

 

Bolster

 

 

E1 Post 

U Big 

pillow 

 

E2 Post2 

V Small 

pillow  1 

 

E3 Post 

W Cushion 

E4 Post 

 

X Bib 

 

F Middle 

beam 

 

AA 5/16”-18*2.125 

Bolts 

 

G Back 

rail 

 

BB 5/16”-18*0.75 

Bolts 

12 

 

H Side 

rail 

 

CC 5/16”-18 

Nuts 

 

I Front 

supporter 

 

DD 5/16”-18*1.75 

Bolts 

 

J Back 

supporter 

 

EE 1/4”-20*1.4 

Bolts 

 

K Seat 

frame  1 

 

FF 1/4”-20*1.25 

Bolts 

 

L Back 

frame 1 

 

GG 1/4”-20 

Nuts 

 

M1 

Left arm

 

 

HH 3/16”-24*0.4 

Bolts 

 

M2 

Right arm

 

 

II Nails 

5/16"*7 

 

N Adjusting 

bar 

 

JJ Allen 

key 

1/4”-20 

 

 

O Suspender  4 

 

KK Wrench 

1/4”-20/5/16”-18  

 

P Latch 

 

MM Bolts 

1/4"-20*2  2 

 

PP Bolts 

(preassembled) 

 

NN Plastic 

washer  2 

 

Parts List 

Summary of Contents for SWING BED L-GZ347PST-WTN

Page 1: ...ASSEMBLY INSTRUCTIONS SWING BED RONA CODE 38115042 ITEM L GZ347PST WTN...

Page 2: ...4 G Back rail 1 BB 5 16 18 0 75 Bolts 12 H Side rail 2 CC 5 16 18 Nuts 8 I Front supporter 1 DD 5 16 18 1 75 Bolts 4 J Back supporter 1 EE 1 4 20 1 4 Bolts 4 K Seat frame 1 FF 1 4 20 1 25 Bolts 6 L Ba...

Page 3: ...the top hold of post 1 E1 post 2 E2 post 3 E3 post 4 E4 and then insert short beam D into the top hold of post 1 E1 post 2 E2 post 3 E3 post 4 E4 Fig 2 3 Tighten side rail H onto post 1 E1 post 2 E2 p...

Page 4: ...into the hole of top connection A Fig 5 6 Spread the small canopy R and large canopy S don t spread the large canopy fully at this time Fig 6 7 Screw beam of big roof B and post1 E1 post 2 E2 post 3 E...

Page 5: ...and right arm M2 with bolts FF Fig9 10 Tighten seat frame K and back frame L with bolts DD nuts CC Fig10 11 Connect seat frame K left arm M1 and right arm M2 with bolts DD plastic washer NN nuts CC Fi...

Page 6: ...bar N and back frame L with bolts MM nuts GG Fig13 14 Lay the adjustable support of the adjusting bar N on the back supporter J Fig14 15 Hang one of the side of suspender O onto the hooks of arm left...

Page 7: ...he post 1 E1 post 2 E2 post 3 E3 post 4 E4 using nails II to fasten the product Fig 19 20 Fasten latch P and side rail H with bolts HH Fig 20 Maintenance 1 This swing bed is not a permanent structure...

Page 8: ...INSTRUCTIONS DE MONTAGE LIT BALAN OIRE CODE RONA 38115042 ARTICLE No L GZ347PST WTN...

Page 9: ...4 G Balustre arri re 1 BB Boulons 5 16 18 0 75 12 H Balustre lat ral 2 CC crous 5 16 18 8 I Support avant 1 DD Boulons 5 16 18 1 75 4 J Support arri re 1 EE Boulons 1 4 20 1 4 4 K Cadre du si ge 1 FF...

Page 10: ...E1 poteau 2 E2 poteau 3 E3 poteau 4 E4 et puis Introduisez chaque extr mit de la poutre courte D dans les connexions sup rieures du poteau 1 E1 poteau 2 E2 poteau 3 E3 poteau 4 E4 Fig 2 3 Fixez le bal...

Page 11: ...rous de la connexion du toit A Fig 5 6 talez le petit auvent R et le grand auvent S mais n tendez pas compl tement le petit auvent Fig 6 7 Boulonnez la poutre du grand toit B au poteau 1 E1 poteau 2 E...

Page 12: ...des boulons FF Fig 9 10 Fixez le cadre du si ge K et le cadre du dossier L avec des boulons DD et crous CC Fig 10 11 Connectez le cadre du si ge K l accoudoir gauche M1 et l accoudoir droit M2 avec de...

Page 13: ...ier L avec des boulons MM et crous GG Fig 13 14 Posez le support r glable de la barre d ajustement N sur le support arri re J Fig 14 15 Accrochez une des extr mit s de la suspente O sur le crochet de...

Page 14: ...ixez le poteau 1 E1 Poteau 2 E2 poteau 3 E3 poteau 4 E4 au sol avec les clous II pour ancrer l article Fig 19 20 Installez le loquet P au balustre lat ral H avec boulons HH Fig 20 Entretien 1 Cette ba...

Reviews: