![Uberhaus L-GZ924PCO-NEW Instruction Manual Download Page 18](http://html1.mh-extra.com/html/uberhaus/l-gz924pco-new/l-gz924pco-new_instruction-manual_3183063018.webp)
A1 A2
O
18
ASSEMBLY INSTRUCTIONS
22. Secure the netting (O) to the posts 1/2
(A1/A2) using the loop and hoop.
23. Secure the gazebo to the wall with wall
mount sheets (L) using bolts (GG).
23
21. Hang the netting (O) and curtain (P) to
the netting tube of front beams 1/2
(B
3
/B
4
) and side beams 1/2 (D1/D2).
21
22
B
3
B
4
D1
D2
O
P
A1 A2
L
GG
Hardware Used
GG
x 4
M6 X 80
Expansion Bolt