![Uberhaus 98495005 Operator'S Manual Download Page 7](http://html.mh-extra.com/html/uberhaus/98495005/98495005_operators-manual_832616007.webp)
D
D
90
°
STEP:K
STEP:M
STEP:N
BASE
INSTALLATION ON TILED WALL
2
STEP:O
2
STEP:L
13
12
Put the base on the correct position.
Remove the base.
Cover the marked space with mortar.
Mortar
CONTINUED
Trace the base outline on the floor with
a pencil. Mark drain location as well.
Walls in your bathroom must be vertical
for an optional installation.