Page
24
Step 18 (optional)
Only perform this step in preparation for winter, if you decide not to
disassemble the shelter.
18.Install the Supporting Posts for winter (B2 and B3) under the horizontal supporting beams, that is,
the second and fourth beam from the front of the shelter (or on the Reinforcing Bars G2). Proceed to
this step before the winter season to enhance the roof loading ability when there is an accumulation of
snow.
NOTE:
In the above illustration, some roof panels are removed in order to clearly show where the
Supporting Posts (B2 & B3) should be placed. Do not remove roof panels for this step.
B2
G
F
B
3
Summary of Contents for 72255159
Page 14: ...Page 14 Step 8 8 Attach the Rail E to the Rail D with Screws T X 5 D D T T E E ...
Page 18: ...Page 18 Step 12 12 Attach the Back Roof Holder Bar H with Screws V X 3 V H H V J J1 J2 ...
Page 37: ...Page 37 Étape 8 8 Installez les rail E sur les rails D à l aide des vis T X 5 D D T T E E ...