![Uberhaus 38115211 Operator'S Manual Download Page 7](http://html1.mh-extra.com/html/uberhaus/38115211/38115211_operators-manual_3152347007.webp)
Fig.1:
先将地钉盖
(B)
套在立柱
(A)
内
,
再用螺栓
(CC)
和垫片
(BB)
将地钉片
(C)
安装在立柱
(A)
上。
Fig.2:
用螺栓
(AA)
和垫片
(BB)
将斜梁下连接件
(I1)
安装在立柱上。
Fig.3:
将塑料挂环
(EE)
安装在装饰槽滑槽上,装饰槽
3(E3)
和装饰槽
4(E4)
的内外滑槽各装
4
个塑料挂环
(EE)
,装饰槽
1(E1)
和装饰槽
2(E2)
的内外滑槽各装
5
个塑料挂环
(EE)
。
Fig.4:
将
U
形插片
(P)
插入装饰槽
3(E3)
和装饰槽
4(E4)
内,用螺栓
(AA)
和垫片
(BB)
将直梁下连接件
(I2)
和
装饰槽
3(E3)
、装饰槽
4(E4)
固定。
Part
Description
Quantity
Image
AA
M6X15 Screw
14
BB
M6 Flat washer
44
DD
M6X25 Bolt
22
GG
M6X80
Anchor
4
LL
M6X25 Bolt
8
Hardware Pack 2
Fig.6: Attach front beams (B1/B2) to posts (A3/A4) with bolts (DD), flat washers (BB)
Fig.7: Connect back beam 1/ beam junction 2/ back beam 2 (C1/H1/C2) with bolts (DD), bolts (LL), flat washers (BB).
Fig.8: Fix back beams (C1/C2) to posts (A1/A2) with bolts (CC), flat washers (BB).
Fig.9: Fix beam junction 3 (H3), support beam 1/2/3/4 (F1/F2/F3/F4) and beam junction 2 (H2) with bolts (II), flat
washers (BB), nuts (JJ)
Fig.10: Fix support beam 2/4 (F2/F4) to right side beam (D2) with bolts (DD), flat washers (BB), repeat
this step for
beam 1/3 (F1/F3) and left side beam (D1)
Fig.11: Fix support bar (K) to left side beam (D1) and front beam 1(B1) with bolts (DD) and flat washers (BB). Repeat
this step for
others.
right side beam (D2)/ front beam 2 (B2)
Part
Description
Quantity
Image
KK
Φ8*180mm spike
14
Hardware Pack 3