·
·
·
Insert two junction bars (F2) half way into the track (F) and insert screws (V).
Insert the other half of the junction bars (F2) into the track (F1) and insert
screws (V). Make sure that the screws are tightened.
Insert two junction bars (F2) half way into the track (G) and insert screws (V).
Insert the other half of the junction bars (F2) into the track (G1) and insert
screws (V). Make sure that the screws are tightened.
Insert the junction bar (G3) half way into the solidifying bars (G2) and insert
screws (V). Insert the other half of the junction bar (G3) into the solidifying
bars (G2) and insert screws (V). Make sure that the screws are tightened.
Repeat with other solidifying bars (G2).
Step
-
3
-
7
-
F
F1
F2
F2
G
G1
G2
G2
G3
1
1
2
F2
G3
V
V
V
1
2
x1
x2
G
3
x1
x1
x4
G
2
F
x1
F
1
x4
F
2
G
G
1