background image

Part # 1382692 Rev 2 (09/04)

Page 4

INSTALLATION

INTRODUCTION

U.S.  Range  manufactures  the  “Regal”  Char-Broiler 

(RBA) in widths from two to six feet, to be used either 

as  freestanding  counter  units  or  built  into  either  a 

“Cuisine” or “Performer” range. All broilers are shipped 

completely assembled, with the double drip pans and 

pressure regulator packed on top of the broiler. A piece 

of 2x4 lumber is strapped to the radiants to prevent 

vibration damage. All units are inspected at the factory 

before shipping.

Uncrating

After uncrating, immediately check the equipment for 

visible signs of shipping damage.
If such damage has occurred, do not refuse shipment, 

but contact the shipper and file the appropriate freight 

claims.

Rating Plate

The  rating  plate  is  attached  to  the  right  side  of  the 

appliance.
When  corresponding  with  the  factory  or  your  local 

authorized  factory  service  center  regarding  service 

problems or replacement parts, be sure to refer to the 

particular unit by the correct model number (including 

the  prefix  and  suffix  letters  and  numbers)  and  the 

warranty serial number. The rating plate affixed to the 

unit contains this information.
Other information on this plate is the BTU/hr input 

to the burners, outlet gas pressure in inches WC, and 

whether orificed for natural or propane gas.
WARNING  All  U.S.  Range  char-broilers  must  be 

connected only to the type of gas identified on the rating 

plate! 

Clearances

The appliance area must be kept free and clear of all 

combustibles.  This  unit  is  design-certified  for  the 

following installations:
1.  For installation in non-combustible locations only.
2.  For use only with four-inch high adjustable legs.
3.  Zero  clearance  is  required  from  non-combustible 

construction at sides and rear.

Adequate clearances must be maintained at all times in 

front and at the sides of the appliance for servicing and 

proper operation.

Positioning and Setup

Place a carpenter’s spirit level left-to-right on the front 

landing ledge and across the back trim, and also front-

to-back on the right and left end trims. Level to the 

high corner with the screw adjustment built into the 

foot of each leg.

Air Supply and Ventilation

The area around the appliance must be kept clear to 

avoid any obstruction to the flow of combustion and 

ventilation air, as well as, for ease of maintenance, service 

and proper appliance operation. Keep proper clearances 

for adequate air supply. 
Means must be provided for any commercial, heavy-

duty cooking appliance to exhaust combustion waste 

products to the outside of the building. This is doubly 

important  for  open-grate  broilers,  since  the  design 

promotes grease dripping through the grate onto the 

hot radiants, sending smoke back up through the product 

as flavor enhancement. “Regal” series char-broilers must 

be installed under a vent hood. Filters and drip troughs 

should be part of any industrial hood, but consult local 

codes before construction and installation.

Summary of Contents for "REGAL" SERIES

Page 1: ...US Range authorized service agent using genuine Garland US Range replacement parts Garland US Range will have no obligation with respect to any product that has been improperly installed adjusted ope...

Page 2: ...servicing of this product could expose you to airborne particles of glass wool ceramic bers Inhalation of airborne particles of glass wool ceramic bers is known to the State of California to causes ca...

Page 3: ...4 Standards 5 Gas Supply 5 National Code Requirements For Gas Supply 5 Manual Shut o Valve 5 Pressure Regulator 5 Rigid Connections 6 Flexible Couplings Connectors 6 Manual Pilot Valve 6 Testing And A...

Page 4: ...e of gas identi ed on the rating plate Clearances The appliance area must be kept free and clear of all combustibles This unit is design certi ed for the following installations 1 For installation in...

Page 5: ...S Range Regal char broilers use a 3 4 NPT inlet Sealant on all pipe joints must be resistive to LP gas To convert to propane or natural gas contact a certi ed service agency National Code Requirements...

Page 6: ...be installed with exible couplings and or quick disconnect ttings the installer must use an AGA design certi ed commercial exible connector or at least INSTALLATION Continued 3 4 NPT with suitable st...

Page 7: ...r service NOTE It may be necessary to re light the pilots several times until the new lines are purged of any trapped air and constant gas ow is attained Final Preparation New units are wiped clean wi...

Page 8: ...ey occur and at the end of the day both pans should be washed in hot soapy water Weekly If a daily maintenance is performed as recommended above weekly maintenance will not be required beyond the dail...

Page 9: ...Part 1382692 Rev 2 09 04 Page 9 NOTES...

Page 10: ...Part 1382692 Rev 2 09 04 Page 10 NOTES...

Page 11: ...Part 1382692 Rev 2 09 04 Page 11 NOTES...

Page 12: ......

Reviews: