For technical questions please call 1-800-444-3353
Sku 66958
Page 6
(See Figure B, and Parts list on Page 10.)
4. Align the mounted Remover/Installer (part 13), ball joint, and Reciever Tube
(part 1, 2, 3, 4, 5, 6, 10, or 11) to allow removal of the ball joint.
5. Using a wrench, turn the Forcing Screw assembly clockwise to remove the ball joint.
To install a Ball Joint:
(See Figure B, and Parts list on Page 10.)
1. Mount the Remover/Installer (part 13) on the Forcing Screw assembly so that the
larger
diameter portion of the Remover/Installer faces the
threaded
hole of the C-
Frame, and the
smaller
diameter portion faces the
unthreaded
side of the ball joint.
2. Place the mounted Remover/Installer (part 13) on the
unthreaded
side of the
ball joint.
3. Align the mounted Remover/Installer (part 13), ball joint, and proper size Reciever
Tube (part 1, 2, 3, 4, 5, 6, 10, or 11) to allow installation of the ball joint.
4. Using a wrench, turn the Forcing Screw assembly clockwise to install the ball joint.
ReCeiVeR TuBe
(1, 2, 3, 4, 5, 6, 10, 11)
RemOVeR/inSTalleR
(13)
PluG BOlT
(14)
FORCinG SCReW
C-FRame
Figure B