background image

30

NO

NO

NO HOSE SECURELY 

CONNECTED TO 

CANOPY?

YES

YES

VENT SYSTEM 

FREE OF 

OBSTRUCTIONS?

YES

REPLACE 

BLOWER

CLEAR 

OBSTRUCTIONS

NO

REPLACE HOSE

CONNECT HOSE 

TO CANOPY

NO

HOSE FREE OF 

CRACKS OR 

HOLES?

CONNECT MANOMETER TO 

SUCTION PRESSURE SWITCH 

(SEE FIGURE 24). IS SUCTION 

PRESSURE GREATER THAN:

-0.50 IWC FOR IN3/4PV

-0.80 IWC FOR IN5/6PV

YES

REPLACE SUCTION PRESSURE 

SWITCH

REPLACE IGNITION MODULE

NO

NO

24 VOLTS AT SUCTION 

PRESSURE SWITCH 

TERMINAL 'NO'?

YES

DISCONNECT IGNITER/SENSOR 

CABLE FROM IGNITION MODULE 

TERMINAL (9). HOLD CABLE 

NEAR TERMINAL. IS SPARK 

PRESENT?

YES

CHECK IGNITER/SENSOR CABLE, GROUND WIRE, CERAMIC 

INSULATOR, AND GAP. CHECK IGNITER/SENSOR CABLE BOOT FOR 

SIGNS OF MELTING OR BUCKLING.

GO TO PAGE 31

NO

DOES BLOWER ENERGIZE?

YES

SPARK PRESENT 

AT PILOT IGNITER/

SENSOR?

YES

TURN OFF GAS SUPPLY.

ADJUST THERMOSTAT TO CALL FOR HEAT.

DID BLOWER OPERATE 

FOR 30 TO 50 SECONDS 

BEFORE SPARK BEGAN?

NO

REPLACE IGNITION 

MODULE

YES

TURN ON GAS SUPPLY.

DOES PILOT BURNER 

LIGHT?

YES

24 VOLTS ACROSS GAS 

VALVE TERMINALS 'PV' 

AND 'MV-PV'?

YES

NO

NO

YES

NO

OPEN VALVES

ALL MANUAL GAS VALVES OPEN?

IS PILOT BURNER ORIFICE 

BLOCKED?

YES

CLEAN OR REPLACE PILOT 

BURNER ORIFICE

NO

NO

24 VOLTS ACROSS IGNITION 

MODULE TERMINALS 'PV' AND 

'MV-PV'?

REPLACE IGNITION 

MODULE

YES

CONTACT GAS 

SUPPLIER

NO

IS GAS SUPPLY PRESSURE 

BETWEEN 4.5 AND 13.5 IWC?

YES

REPAIR OR REPLACE WIRES

REPLACE GAS VALVE

NO

DOES SPARK STOP 

AFTER PILOT IS LIT?

YES

MAIN BURNER LIGHTS?

YES

BOILER CONTROL SYSTEM 

SEQUENCING PROPERLY. 

CHECK DISTRIBUTION 

SYSTEM

24 VOLTS ACROSS GAS 

VALVE TERMINALS 'MV' 

AND 'MV-PV'?

YES

REPLACE GAS VALVE

NO

24 VOLTS ACROSS IGNITION 

MODULE TERMINALS 'MV' AND 

'MV-PV'?

YES

REPAIR OR REPLACE WIRES

NO

REPLACE IGNITION 

MODULE

NO

CHECK CONTINUITY OF IGNITION CABLE AND GROUND WIRE. CLEAN FLAME ROD. 

CHECK ELECTRICAL CONNECTIONS BETWEEN FLAME ROD AND IGNITION MODULE. 

CHECK FOR CRACKED CERAMIC FLAME ROD INSULATOR. CHECK PILOT FLAME

(SEE FIGURE 19). IF CHECKS OKAY, REPLACE IGNITION MODULE.

Summary of Contents for INDEPENDENCE IN3PV

Page 1: ...E P E D N I V P R E L I O B D E R I F S A G For service or repairs to boiler call hour heating contractor When seeking information on boiler provide Boiler Model Number and Serial Number as shown on...

Page 2: ...tuation which if not avoided could result in death serious injury or substantial property damage CAUTION Indicates a potentially hazardous situation which if not avoided may result in moderate or mino...

Page 3: ...stem is necessary to allow noxious fumes that could cause injury or loss of life to vent safely and will contribute toward maintaining the boiler s efficiency This boiler is supplied with safety devic...

Page 4: ...and combustible material in accordance with local fire ordinance Refer to Table 1 for minimum listed clearance from combustible material Recommended service clearance is 24 inches from left side righ...

Page 5: ...onfined space Size each opening for minimum free area of 1 square inch per 1 000 Btu per hour input of all equipment in spaces but not less than 100 square inches 7 Ventilation Duct Louvers and Grille...

Page 6: ...stall zone circulator and strainer in supply piping Install check valve to prevent gravity circulation of boiler water 2 Limit Install temperature limit control Honeywell L4006A or equal in Tapping P...

Page 7: ...7 Figure 4 Steam Piping IN3PV Figure 3 Trim Installation III Steam Piping and Trim continued...

Page 8: ...ing natural gas Table 5 lists equivalent pipe length for standard fittings 4 Specific gravity of gas Corrections for the specific gravity of natural gas can be found in Table 6 For materials or condit...

Page 9: ...e For all testing over psig boiler and its individual shutoff valve must be disconnected from gas supply piping For testing at psig or less isolate boiler from gas supply piping by closing boiler s in...

Page 10: ...omponents and are approved for use with this product Heat Fab Saf T Vent 800 772 0739 Flex L International Star 34 800 561 1980 Protech Systems Inc FasNSeal 800 766 3473 and Z Flex U S Inc Z Vent 800...

Page 11: ...use 7 Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code NFPA 54 ANSI Z223 1 When resizing any portion of the common v...

Page 12: ...d end only female bell end accepts next fitting or pipe NOTICE Cut must be square with pipe and filed or sanded smooth before joining Carefully ensure roundness of cut pipe by hand with gloves before...

Page 13: ...pipes in horizontal runs at top to avoid condensate from lying on the seams Figure 9 Horizontal Vent Installation V Venting continued CAUTION Moisture and ice may form on surfaces around vent terminal...

Page 14: ...ces above the boiler with materials having a fire resistance rating at least equal to the rating of adjoining floor or ceiling Maintain minimum clearance to combustible materials Note For one or two f...

Page 15: ...8 12 to 20 12 7 ft 6 in Over 20 12 to 18 12 8 ft d Install storm collar on vent pipe immediately above flashing Apply sealant between vent pipe and storm collar e Attach Vent Terminal 7 Install conden...

Page 16: ...ower to thermostat Connect circuit to brown wire to control boiler operation Set thermostat heat anticipator to 0 4 amps See Figure 15 D Alliance SL Indirect Water Heater if used See Figure 15 Ladder...

Page 17: ...ect manometer to gas manifold Use 1 8 NPT tapping provided 4 Temporarily turn off all other gas fired appliances D Follow Operating Instructions to place boiler in operation See Figure 21 E Sequence o...

Page 18: ...ts within 10 seconds control returns to normal sequence If flame out of sequence remains longer than 10 seconds control will resume normal opera tion 1 hour after error is corrected Check for pilot fl...

Page 19: ...er sensor cracked ceramic insulator replace if needed Figure 17B Measuring Pilot Flame Current with Micro ammeter v Check the pilot flame It must be blue steady and envelop the flame sensing rod 3 8 t...

Page 20: ...SARY TO RECYCLE THE CALL FOR HEAT MORE THAN ONCE TO CLEAR THE PILOT SUPPLY TUBES OF AIR NOTE IF CONTROL GOES INTO LOCKOUT OR RETRY DELAY RESET THE CALL FOR HEAT CHECK CONTINUITY OF IGNITION CABLE AND...

Page 21: ...below observed pressure Main burners and pilot burner should extinguish and blower stop 3 Adjust limit to setting above observed pressure Ignition sequence should begin 4 Adjust thermostat to lowest...

Page 22: ...y No 4D iii Reinstall gas orifices and main burners Measure input rate 6 Recheck Main Burner Flame 7 Return other gas fired appliances to previous conditions of use M Clean Heating System Oil from new...

Page 23: ...triction 2 Fill boiler to top of gauge glass 3 Remove safety valve 4 Pour recommended boil out compound into boiler through safety valve opening 5 Reinstall safety valve in Tapping E with spindle in v...

Page 24: ...ructions to place boiler in operation See Figure 21 Allow boiler to steam for 10 minutes Drain one quart of water from lower Gauge Glass fitting 25 Drain second quart sample from lower Gauge Glass fit...

Page 25: ...reens securely in place 2 Vent terminal and wall thimble if used must be weather tight 3 Vent pipe must be full round shape and show no damage from impact or excessive temperature 4 Vent pipe must be...

Page 26: ...original location See Table 14 b Main burners must be properly secured in burner tray slot at rear of firebox and over gas orifice See Figure 23 c Pilot gas supply igniter sensor cable and ground wire...

Page 27: ...Figure 25 L404F Pressuretrol Boiler Model Minimum Vacuum IN3PV 0 40 inches w c IN4PV 0 40 inches w c IN5PV 0 70 inches w c IN6PV 0 70 inches w c VIII Service Instructions continued 4 Stop boiler remo...

Page 28: ...Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separatel...

Page 29: ...29 SERVICE RECORD DATE SERVICE PERFORMED...

Page 30: ...ECONDS BEFORE SPARK BEGAN NO REPLACE IGNITION MODULE YES TURN ON GAS SUPPLY DOES PILOT BURNER LIGHT YES 24 VOLTS ACROSS GAS VALVE TERMINALS PV AND MV PV YES NO NO YES NO OPEN VALVES ALL MANUAL GAS VAL...

Page 31: ...NC NO 24 VOLTS AT BOTH L W C O TERMINALS B B YES NO REFER TO L W C O MANUFACTURER S TROUBLESHOOTING INSTRUCTIONS NO FILL BOILER TO NORMAL WATERLINE NO GAUGE PRESSURE LESS THAN LIMIT CUT IN SETTING ALL...

Page 32: ...2J Blower 1 6111714 1 6111715 2K Orifice Plate Gasket 2 Included in Key No 2J 2 8206042 2 8206035 2L Orifice Plate 1 61110036 1 61110046 1 61110056 1 61110066 2M Washer 1 4 4 80860603 2N Hex Locknut...

Page 33: ...sembly 4 6186001 3E1 Base Leg Included in Key No 3E 4 71860021 3E2 Nylon Glide Included in Key No 3E 1 per leg 8186006 3F Burner Access Panel 1 618600361 1 618600461 1 618600561 1 618600661 3G Left En...

Page 34: ...8236099 8 8236099 4B Main burner with 60 Pilot Bracket 1 8236098 4C Manifold 1 82260033 1 82260043 1 82260053 1 82260063 4D Main Burner Orifice 45 Pink 3 822711 5 822711 7 822711 9 822711 4E Screw Mac...

Page 35: ...B1206 1 103704 01 5B Pilot Orifice Natural Gas Honeywell 388146NE Included with Key No 5A 5C Compression Nut Fitting 1 8 OD x 1 4 NPT Included with Key No 5A and 5E 5D Pilot Tubing 1 8 OD x 40 1 82361...

Page 36: ...4100440 1 604100540 1 604100640 6E Blower Access Panel 1 604100371 1 604100471 1 604100571 1 604100671 6F Rear Panel 1 604100350 1 604100450 1 604100550 1 604100650 6G Front Top Panel 1 604100360 1 60...

Page 37: ...Steam Gauge 0 30 psi 2 1 2 Dia 1 100325 01 9B Drain Valve Conbraco 31 612 02 1 806603012 9C Bushing Hex 2 NPT x 3 4 NPT 1 806600515 9D Gauge Glass Set 9 Glass Conbraco 21 104 10 1 8056128 9E Limit Ho...

Page 38: ...Bracket 1 7186018 10D1 Screw Sheet Metal 8 x 1 2 1 80860019 10E Suction Pressure Switch Red 1 60160876 Suction Pressure Switch Lt Blue 1 60160877 10F Silicone Tubing 1 8 O D x 20 1 7016020 10G Transf...

Page 39: ...ription Quantity Part Number IN3PV IN4PV IN5PV IN6PV 11 Gasketed Vent Accessory Carton Includes 11A 11B 61110128 61110129 11A Vent Connector 1 8116306 1 8116307 11B Vent Terminal 1 8116310 IX Repair P...

Page 40: ...nd Gasketed Male Vent Joint Detail Figure 9 13 Horizontal Vent Installation Figure 10 14 Horizontal Vent Terminal Figure 11 14 Vertical Vent Installation Figure 12 15 Vertical Vent Tee Installation Fi...

Page 41: ...Lengths Table 6 9 Specific Gravity Correction Factors for Natural Gas Section V Venting Table 7 10 Maximum Equivalent Vent Length Table 8 11 Vent System Components Table 9 15 Minimum Vent Height Abov...

Page 42: ...42 SERVICE RECORD DATE SERVICE PERFORMED...

Page 43: ...43 SERVICE RECORD DATE SERVICE PERFORMED...

Page 44: ...44 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...

Reviews: