background image

Installation Guide

12 

Ice Machines

The unit requires a 1/4" O.D. soft copper supply line, or flexible 
water supply kit from U-Line (Part No. WATERHOOKUP). 

WARNING

!

Prior to attempting installation, determine if this product 
contains a gravity style drain or factory installed drain 
pump. Products without a drain pump may only use a 
gravity style drain. Failure to connect water supply or 
drain line connections properly may result in water 
leakage, personal injury, and/or property damage. 
Disconnect power and turn off water to the unit before 
attempting to alter these connections. Please consult 
U-Line or your installation instructions for further details. 
These connections are the responsibility of the owner and 
must be connected per local plumbing code. If you are 
uncertain of how to safely and properly install this 
product, contact a licensed plumber. 

Water Connections:

CAUTION

!

Review, obey, and understand the local plumbing codes 
before you install your unit. Connect to the cold water 
supply. The water pressure should be between 20 and 
120 psi. The water line MUST have a shut-off valve on the 
1/4" supply line.

CAUTION

!

• U-Line requires the use of copper tubing for installation or 

the U-Line water hookup kit available at www.u-line.com. 
This kit includes a flexible water supply connecting hose 
and brass fitting.

• Do not use any plastic water supply line. The line is under 

pressure at all times. Plastic may crack or rupture with 

age and cause damage to your home.

• Do not use Teflon tape or joint compound on the water 

fitting. The rubber washer provides an adequate seal. 

Other materials could cause blockage of the valve.

• Failure to follow recommendations and instructions may 

result in damage and/or harm, flooding or void the 

product warranty.

1/4” Copper Water Supply Connection

CAUTION

!

Turn off water supply and disconnect electrical supply to 
unit prior to attempting installation.

1. Turn off water supply and disconnect electrical supply to product 

prior to attempting installation.

2. Remove back panel of unit.

3. Remove front panel of unit. See image below for location of front 

panel screws. 

4. Locate the desired cold water supply location.

5. Attach a 1/4" copper line to this 

location and route the tubing to the 
appliance. Leave approximately 8' of 
water line to be coiled behind the 
appliance. The water line should be 
looped into 2 coils. This will allow 
the line to flex when removing the 
unit for cleaning and service. Do not 
kink or pinch the coiled line. 

6. Take the end of the copper tubing 

and put the line through the hole in the back panel.

7. Then take the end of the copper tubing and feed it through the 

opening between the condenser and the side of the unit. The 
copper tubing should be within two inches of the top of the 
compartment. 

8. Locate the U-Line supplied hose fitting. Ensure the end on the 

copper tubing has been cut straight and is free of burrs. Slide the 

10 Prepare Plumbing

Front Panel

Remove screws 
(one on each side) 
to access behind 
the front panel

Water inlet line 
should be within 2 
inches of the top of 
the compartment

Summary of Contents for 3018CLRS00

Page 1: ...Undercounter Leader Since 1962 U LINE COM INSTALL GUIDE MODULAR 3000 SERIES 120V 3018CLR MODELS U 3018CLROL 00 U 3018CLROL 01 U 3018CLROL 40 U 3018CLROL 41 U 3018CLRS 00 U 3018CLRS 01 U 3018CLRS 40 U...

Page 2: ...ronmental Requirements 5 6 3000 Series Doors Door Alignment and Adjustment 6 7 3000 Series Overlays Overlay Frame Overlay Panel 7 Panel Preparation 7 Panel Installation 7 Overlay Grille 9 Overlay Gril...

Page 3: ...s in place so children may not easily climb inside WARNING SHOCK HAZARD Electrical Grounding Required Never attempt to repair or perform maintenance on the unit until the electricity has been disconne...

Page 4: ...leaning with a good quality all in one stainless steel cleaner polish on a monthly basis For best results use Claire Stainless Steel Polish and Cleaner which can be purchased from U Line Corporation P...

Page 5: ...ion to a grounded three prong polarized receptacle that has been placed by a qualified electrician The unit requires a grounded and polarized 115 VAC 60 Hz 15A power supply normal household current An...

Page 6: ...allation Guide 4 Ice Machines 3018 Series 4 Product Dimensions 33 11 16 To 34 11 16 23 1 4 17 3 4 Solid Overlay Door 3 5 8 To 4 5 8 3 5 8 To 4 5 8 33 11 16 To 34 11 16 24 Stainless Steel Solid Door 17...

Page 7: ...each unit s electrical specifications requirements Power Supply The unit requires a grounded and polarized 115 VAC 60 Hz 15A circuit normal household current See Electrical Specifications Environment...

Page 8: ...em Pay special attention to the Cable Arm Make sure not to over extend or damage it during door alignment Stainless Models Removing Wrap 1 Open door completely 2 Using a Phillips screwdriver remove th...

Page 9: ...liance will need up to 34 1 2 to the under side of the counter to leave room for leveling adjustments 1 Cut the panels to the dimensions listed in the diagram below 2 Optional Stain or Finish panel to...

Page 10: ...2 deep using the holes in the door frame as a guide 8 Locate 6 of the 6x 1 1 2 screws provided with your unit 9 Using a phillips screwdriver place one screw into each of the 6 pilot holes and screw do...

Page 11: ...ght 2 Finish your grille overlay to match your surrounding cabinetry Finish front back and edges to prevent warping Carefully follow the manufacturer s recommendations for finish application and cure...

Page 12: ...TALL 4 Open both doors completely Make certain doors clear surrounding cabinetry 5 Using the anti tip bracket as a template use a 3 32 drill bit to drill pilot holes 5 8 deep into bottom of countertop...

Page 13: ...ord 2 Gently push the unit into position Be careful to not entangle the electrical cord water line and drain line 3 Re check the leveling from front to back and side to side Make any necessary adjustm...

Page 14: ...with age and cause damage to your home Do not use Teflon tape or joint compound on the water fitting The rubber washer provides an adequate seal Other materials could cause blockage of the valve Fail...

Page 15: ...d the right side of the unit This tubing should be within two inches of the top of the compartment 5 Take the end of the braided line and put the line through the hole in the back panel 6 Locate the d...

Page 16: ...length 2 Connect to your local plumbing per the local code 3 If necessary insulate drain line to prevent condensation 4 Test the drain system per the test procedure under Final Installation WARNING F...

Page 17: ...U Line P60 drain pump The U Line P60 drain pump is available through your dealer with complete installation instructions Final Installation NOTICE In the event of a power outage restricted drain or p...

Page 18: ...wth of Ben Hur Freezer Company and was the first to develop and patent an automatic stand alone undercounter residential ice maker His foresight and determination to develop new ideas and to succeed w...

Reviews: