Page 1: ...1 10999145_en EN Floor grinding machine FGE 450 Translation of the original operating manual 4...

Page 2: ...2 5 2 10 7 4 1 8 Fig A 3 9 6 Fig B 15 1 12 11 14 13 16 19 Fig C 17 18 3 Fig D Fig E Fig F 20 6 21 Fig G Fig H Fig I 5 2 10 4 23 24 22 Fig J 27 26 Fig K 25 28 25...

Page 3: ...3 Operating 6 3 1 Starting up the machine 6 3 2 Operation 7 3 3 Switching the machine off 7 4 Maintenance 8 4 1 Customer service and spare parts 8 4 2 Tilting the machine 8 4 3 Mounting and dismantlin...

Page 4: ...IT Hydrostress AG Liability or warranty is excluded if The instructions in the operating manual have not been observed The machine or its attachments were improperly operated The maintenance was carri...

Page 5: ...equipment must be checked for com pleteness and function before starting up The safety equipment must be mounted during operation The surfaces to be processed by the machine must be free of obstacles...

Page 6: ...e initial start up of the machine may be car ried out only by qualified personnel A visual inspection of the machine must be car ried out before starting up the machine Particular attention should be...

Page 7: ...g the safety switch the machine has to be held firmly by the handle of the guide bar High voltage electrical current can be fatal Do not allow the power line to be run over crushed or pulled on The di...

Page 8: ...the stretched position Chapter 3 1 4 Tilt the machine and place it on the floor Fig HI 4 3 Mounting and dismantling ETX diamond tools The consistency of the surface to be ground determines the type o...

Page 9: ...front position over the drive motor Chapter 3 1 or Restart the machine Chapter 3 1 page 6 5 Acceptance and transportation Observe the safety instructions in Chapter 2 5 1 Machine acceptance The packa...

Page 10: ...o d must be carried out by 2 persons One person has to hold the carriage by the guide handle 1 Fig A B b Loosen the 4 screws 20 Fig F as far as possible without removing so that the bolts 21 Fig G are...

Page 11: ...distance between rubber lip and the surface to be ground Chapter 3 1 page 6 Grinding pattern is uneven Tools are loose Fasten tools Tools are damaged or worn Replace tools Machine shuts down automatic...

Page 12: ...2006 42 EG Machine Directive 2014 30 EU Electromagnetic Compatibility The following harmonised standards apply ISO 12100 Safety of Machinery EN 60204 1 Electrical Equipment of Machines EN 61000 6 2 EN...

Page 13: ...13...

Page 14: ...TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH Switzerland Telefon 41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com...