![Tylo T825H User Manual Download Page 12](http://html1.mh-extra.com/html/tylo/t825h/t825h_user-manual_1186803012.webp)
3
Person
Infrared
Sauna
Cottage
Page
12
210121
Rev.
2
Front Wall (Box #2):
Start with the door and glass panel piece and move to the Floor panel slot.
Place the Front Wall panel into the Floor panel slot.
Have one person hold the door and glass panel, while another brings the last glass panel.
While the left front glass piece is positioned, open the door to allow more work space.
Note:
Secure the door from falling open and breaking while setting the Front Wall panel. It may be
helpful to use your knee to help push in the Front Wall panel while lowering into place.