3
connect to the controller solar panel input. Make sure to maintain cor-
rect polarity.
STEP 5:
Install batteries to enclosure using Velcro straps.
If the Solar Controller is model
TP-SC12xx
you must wire batter-
ies and solar for 12V configuration. If Solar controller is model
TP-SCPOE-24xx
you must wire solar panels and batteries for
24V configuration.
STEP 6:
Connect the Battery cables to Controller BAT terminals and
then to the batteries. Be sure to observe polarity. Black wire connects to
battery negative terminal and BAT(-) terminal on the controller. When a
fully charged battery is connected, the Green LOA LED should light on
controller and power should be present on POE output and also green
wire terminal connector.
STEP 7:
Make sure lid gasket is clean and free from any particles, then
carefully close the cover, making sure that wires are clear of the seam
and hinge area. The cover snaps into place. There is one center securi-
ty bolt that can be used to secure the cover.
NOTE: If you have any unconnected battery connectors on battery
cable after installation, make sure they are wrapped with electrical
tape so that there is no chance of shorting the connector to any
metal. You can also remove the extra cable/connector permanently
by cutting the cable at the existing battery connection.
Controller Wire Terminal Output Wiring
Device 1
Device 2
FG
= Frame Ground. Connect to Earth
Ground
V-
(There are two V– connections)
V+
(There are two V+ connections)
+
-
+
-