![TYCON Solar UPSPro UPS-PL Manual Download Page 3](http://html.mh-extra.com/html/tycon-solar/upspro-ups-pl/upspro-ups-pl_manual_1186560003.webp)
3
recommended to protect
electronics from lightning/
surge damage that the pow-
er supply be plugged into a
surge protected outlet inside
the building.
STEP 8:
Make sure lid gas-
ket is clean and free from
any particles, then carefully
close the cover, making sure
that wires are clear of the
seam and hinge area. The
cover snaps into place.
There is one center security
bolt that can be used to secure the cover.
NOTE: If you have any unconnected battery connectors on battery
cable after installation, make sure they are wrapped with electrical
tape so that there is no chance of shorting the connector to any
metal. You can also remove the extra cable/connector permanently
by cutting the cable at the existing battery connection.
12V Battery Configuration
UPSPro®