Pre-Installation Planning
3–2
iSTAR eX Installation and Configuration Guide
Pre-Installation Planning
Pre-installation involves the following:
1. Checking equipment (hardware, software, power supply, and wiring).
2. Checking power, wiring, equipment clearances, and code compliance at
the site.
3. Ensuring the proper tools are available.
Equipment Check
Verify that the contents of the shipped boxes match the packing lists. Contact
Software House if any items are missing or damaged.
The iSTAR eX hardware does not include mounting hardware for an
installation. Mounting hardware depends upon the site and must be
approved by a structural engineer or other certified professional.
Software House recommends anchoring systems capable of sustaining a 75 lb.
(34.1 kg) load.
Site Check
Ensure that the mounting site is ready:
Mounting dimensions
• Upper mounting holes are 14.25" (36.195 cm) center to center.
• Bottom mounting holes are 21.35" (54.229 cm) below the upper mount
holes.
The site has been approved and all wiring complies with UL
requirements and other codes, as appropriate.
All preliminary site work is complete.
An appropriate power supply is accessible.
T
he site is clean and free of dust or other contaminants.
Summary of Contents for iSTAR eX
Page 12: ...Table of Contents xii iSTAR eX Installation and Configuration Guide...
Page 58: ...Backup and Restore 1 38 iSTAR eX Installation and Configuration Guide...
Page 146: ...Starting the ICU 5 12 iSTAR eX Installation and Configuration Guide Figure 5 4 ICU Main Window...
Page 200: ...STAR eX Diagnostic Tests 7 10 iSTAR eX Installation and Configuration Guide...
Page 212: ...A 12 iSTAR eX Installation and Configuration Guide...