General 

Description

The TYCO AQUAMIST Red-E Mist 

Supply Skid is a tank-based nitrogen-

propelled water supply unit for the 

Ultra Low Flow AQUAMIST System. 

The Red-E Mist Supply Skid consists 

of a bank of nitrogen supply cylinders 

and one or two water supply tanks. The 

nitrogen is regulated to pressurize the 

head space inside the tank, pressuriz-

ing the water used to supply the Ultra 

Low Flow AQUAMIST System.
The Red-E Mist Supply Skid is avail-

able in two sizes. The Model 600 skid 

consists of one 600 gallon (2271 liter) 

water supply tank with four nitrogen 

supply cylinders. The Model 1200 skid 

consists of two 600 gallon (2271 liter) 

water supply tanks with eight nitrogen 

supply cylinders. Refer to Table A for 

the maximum capacity and pressure of 

each skid arrangement. The skids can 

be ordered in configurations conform-

ing to either ASME/DOT or TPED/CE.

Training

Training provided by Tyco Fire Protec-

tion Products (TFPP) is mandatory prior 

to bidding, designing, procurement of 

components, installation, and mainte-

nance of the TYCO AQUAMIST Red-E 

Mist Supply Skid. These systems 

are unique in their intent and design. 

Anyone involved at any level must thor-

oughly understand the limitations and 

capabilities of such systems.

Table of 

Contents

Sections

General Description .  .  .  .  .  .  .  .  .  .  .  .  . 1
Training  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 3
Technical Data   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 3
Skid Operation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 3
System Components  .  .  .  .  .  .  .  .  .  .  .  . 6
Planning   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6
Installation   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
Setting the Skid for Service   .  .  .  .  .  . 7
System Reset after Discharge   .  .  .  . 8
Care and Maintenance   .  .  .  .  .  .  .  .  .  . 9
Limited Warranty   .  .  .  .  .  .  .  .  .  .  .  .  .  . 10
Ordering Procedure .  .  .  .  .  .  .  .  .  .  .  . 10

Figures

FIGURE 1 

AQUAMIST Red-E Mist Supply Skid 

Replacement Parts, Accessories

and Typical Installation Piping   .  .  .  . 2
FIGURE 2 

Water Supply Tank Assembly

600 Gallon (2271 Liter) .  .  .  .  .  .  .  .  .  .  . 3
FIGURE 3 

ASME/DOT Nitrogen Supply Skid

600 Model  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
FIGURE 4 

ASME/DOT Nitrogen Supply Skid

1200 Model   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
FIGURE 5 

TPED/CE Nitrogen Supply Skid

600 Model  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
FIGURE 6 

TPED/CE Nitrogen Supply Skid

1200 Model   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
FIGURE 7 

Nitrogen Cylinder with CV-98

Valve and Actuation Stack   .  .  .  .  .  .  . 6

Graphs

GRAPH A 

Nitrogen Cylinder

Temperature vs . Pressure .  .  .  .  .  .  .  . 9

Tables

TABLE A 

AQUAMIST Red-E Mist Supply

Skid Part Number Selection  .  .  .  .  . 10

Summary of Contents for AQUAMIST Red-E Mist Supply Skid

Page 1: ...ed by Tyco Fire Protec tion Products TFPP is mandatory prior to bidding designing procurement of components installation and mainte nance of the TYCO AQUAMIST Red E Mist Supply Skid These systems are...

Page 2: ...Actuator Arming Tool 75433 16 Water Discharge Shutoff Valve 478432 7 Booster Actuator 428949 17 Water Discharge Y strainer 478331 8 Booster Actuator Reset Tool 429847 18 Water Tank Nitrogen Relief Va...

Page 3: ...ng the first CV 98 Valve This allows pressurized nitrogen to flow into the High Pressure Nitrogen Manifold The increased pressure to the mani fold opens all the CV 98 Valves that are piped into the ma...

Page 4: ...ULATOR ACTUATORS VENT PLUG NITROGEN HEADER BURST SAFETY HEADER CYLINDER 8 CYLINDER RACK CLAMP 51 1 2 1308 mm 864 mm 34 43 1 2 1105 mm FLEXIBLE DISCHARGE 2236 mm SHUT OFF CONNECTION DISCHARGE 1 1 2 NIT...

Page 5: ...C PLUG SAFETY HEADER ACTUATORS HEADER VENT REGULATOR NITROGEN FLEXIBLE DISCHARGE BEND CLAMP 8 CYLINDER RACK RELIEF 63 1600 mm NITROGEN CONNECTION DISCHARGE CYLINDER 1 1 2 NITROGEN SHUT OFF VALVE VALVE...

Page 6: ...r safe inspec tion and system maintenance by allow ing the nitrogen flow to the water tank to be shut off This valve must be locked open when system is in service Water Supply Tank Assembly Water Shut...

Page 7: ...ity of nitrogen through the Water Tank Nitrogen Drain Valves when emptying a discharged system can cause damaging levels of sound and the large volume of nitrogen can deplete the oxygen concentration...

Page 8: ...ng cylinders determine if the cyl inder requires hydrostatic testing prior to being recharged Note last hydro static test date on the cylinder collar If the cylinder does not have a star stamp it requ...

Page 9: ...er is prop erly bracketed Before attaching the assembly make certain the stem is completely backed out by turning the hand wheel counterclockwise until it stops Attach the assembly to the fill port of...

Page 10: ...Specify description P N specify System Applicability FM Approvals Required Discharge Time Minutes Red E Mist Supply Skid Model Water Supply Volume Gallons liters Maximum Flow Rate gpm lpm Outlet Press...

Reviews: