![TYAN YR190-B8238 Service Engineer'S Manual Download Page 23](http://html1.mh-extra.com/html/tyan/yr190-b8238/yr190-b8238_service-engineers-manual_1185626023.webp)
23
http://www.tyan.com
Chapter 2: Setting Up
2.0.1 Before you Begin
This chapter explains how to install the CPUs, CPU heatsinks,
memory modules, and hard drives. Instructions on inserting add on
cards are also given.
2.0.2 Work Area
Make sure you have a stable, clean working environment. Dust and
dirt can get into components and cause malfunctions. Use
containers to keep small components separated. Putting all small
components in separate containers prevents them from becoming
lost. Adequate lighting and proper tools can prevent you from
accidentally damaging the internal components.
2.0.3 Tools
The following procedures require only a few tools, including the
following:
A cross head (Phillips) screwdriver
A grounding strap or an anti-static pad
Most of the electrical and mechanical connections can be
disconnected with your hands. It is recommended that you do not
use pliers to remove connectors as it may damage the soft metal or
plastic parts of the connectors.
Summary of Contents for YR190-B8238
Page 1: ...1 http www tyan com YR190 B8238 Service Engineer s Manual...
Page 2: ...2 http www tyan com...
Page 17: ...17 http www tyan com Rail Kit Rail x 2 Screw Pack...
Page 22: ...22 http www tyan com NOTE...
Page 30: ...http www tyan com 30 5 Place the heatsink on top of the CPU and secure it with 4 screws...
Page 32: ...http www tyan com 32 Memory Population Option Table...
Page 42: ...http www tyan com 42 NOTE...
Page 44: ...http www tyan com 44 Front Components Node HDD PCBs FAN Front Panel Board SATA HDD Board...
Page 62: ...http www tyan com 62 NOTE...
Page 66: ...http www tyan com 66 NOTE...