![Twin-Star International KC4339-P239-40 Instruction Manual Download Page 6](http://html1.mh-extra.com/html/twin-star-international/kc4339-p239-40/kc4339-p239-40_instruction-manual_1184409006.webp)
5
Fig. 3
Fig. 4
Fig. 5
3. Put another support post (O2) on the Semi-circle
panel (D) and tighten.
O2
II
EE
HH
II
4. Crew 2 caster HH and 2 caster II on the base.
5. Install the Semi-Circle Rail (J) by Bolt (DD) and
make sure the end edge through the side panel
holes. Insert wood dowels in the pre-drilled holes.
Put the base from step 4 on the assembly step 3.
Attached it on the side panels by using Bolts and
washers. Make sure the bolts through the holes on
the
rails.
Hardware Used
EE
Screw
x 16
Hardware Used
BB
AA
CC
DD
Bolt
1/4 x 1-1/4 in
x 5
Flat Washer
x 5
Wood Dowel
Bolt
5/32 x 1 in
x 4
x 4
BB
AA
A
DD
DD
J
J
J