INSTALLATION
Connection to sprinkler system
See diagram 1
The sprinkler system at the boiler must be connected to constant water supply
G½”, trough a shutoff valve. The connection piece is to be found at the backside
base.
Make sure that the supply pipe/hose is free of dirt ore the like!
When the system is connected and the water supply is open, it has to bee
tested. Disconnect the hose to the auger channel and test the sprinkler valve by
pressing the red hood, at button of the valve.
After testing the sprinkler system it is important to check that the valve is closing
properly! (Dirt ore the like, in the valve seat, can prevent this)
Connection to chimney
See diagram 2
The flue pipe must be insulated with a 50 mm fire resistant mat, to avoid
that the flue gasses are condensing in it.
It is highly recommended to mount a draught stabilizer on the flue pipe, ore
directly in the chimney.
The draught stabilizer is to be adjusted to 10 Pa.
(
See diagram 2)
Recommended chimney dimensions
Internal diameter chimney
Height chimney
App. Ø130mm
4-6 metre above boiler
Electrical connection
See diagram 3 / 3.1
The connection must have its own separate electrical switch!
The boiler can be built for both 3x400V and 1x230V connection.
Check boiler data plate for electrical connection.