Twin Heat CPI 12 Instructions For Installation Manual Download Page 4

 

 

 

 

 

INSTALLATION

 

Connection to sprinkler system 

See diagram 1 

 

The sprinkler system at the boiler must be connected to constant water supply 
G½”, trough a shutoff valve. The connection piece is to be found at the backside 
base. 
 
Make sure that the supply pipe/hose is free of dirt ore the like! 
 
When the system is connected and the water supply is open, it has to bee 
tested. Disconnect the hose to the auger channel and test the sprinkler valve by 
pressing the red hood, at button of the valve. 
 
After testing the sprinkler system it is important to check that the valve is closing 
properly! (Dirt ore the like, in the valve seat, can prevent this) 

 

Connection to chimney 

See diagram 2 

 

The flue pipe must be insulated with a 50 mm fire resistant mat, to avoid 
that the flue gasses are condensing in it. 

 

It is highly recommended to mount a draught stabilizer on the flue pipe, ore 
directly in the chimney. 

The draught stabilizer is to be adjusted to 10 Pa. 

 

(

See diagram 2)

 

   

 

     Recommended chimney dimensions  

Internal diameter chimney 

Height chimney 

App. Ø130mm 

4-6 metre above boiler 

 

 

 

 Electrical connection 

See diagram 3 / 3.1  

 

The connection must have its own separate electrical switch! 
 
The boiler can be built for both 3x400V and 1x230V connection.  

Check boiler data plate for electrical connection. 

Summary of Contents for CPI 12

Page 1: ...ns for Installation CPI 12 Version 2 1 march 2007 Please go trough the instructions before installing Nørrevangen 7 DK 9631 Gedsted Phone 45 98645222 Fax 45 98645244 Mail twinheat twinheat dk Web www twinheat dk ...

Page 2: ... 2 Connection to sprinkler system page 3 Connection to chimney page 3 Electrical connection page 3 Diagram 1 Connection to heating surface page 4 Diagram 2 Connection to chimney page 5 Diagram 3 Electrical diagram 400V 3 phase page 6 Diagram 3 1 Electrical diagram 230V 1 phase page 7 ...

Page 3: ...re shows the minimum measures in mm that must be kept in the boiler room in order to operate the fuel store as intended The boiler room must have an air inlet Connection to heating surface See diagram 1 The water returning to the boiler must always be at least 60 65ºC hot when using wood pellets and at least 65 70ºC when using grains or wood chips If the above is not respected the corrosion of the...

Page 4: ...nt to check that the valve is closing properly Dirt ore the like in the valve seat can prevent this Connection to chimney See diagram 2 The flue pipe must be insulated with a 50 mm fire resistant mat to avoid that the flue gasses are condensing in it It is highly recommended to mount a draught stabilizer on the flue pipe ore directly in the chimney The draught stabilizer is to be adjusted to 10 Pa...

Page 5: ...urn and supply cold water 3 ways thermostatic mixing valve shunt V4 The shunt is to provide a homogenous temperature of the return water to the boiler app 60 70 C Air relief V5 Placed where needed Safety valve 2 5 bar V6 Thermometer T1 T2 Temperature sensor Tf For regulating the mixing valve Manometer M1 Manometer for boiler pressure Pump P Circulating pump for boiler and heating surface A B AB Tf...

Page 6: ...ction to chimney The chimney must never be placed directly on the stoker Fig 2 Brick build chimney Cpi 12 Elbow Ø133x87 with mudhole Draught stabilizer Cpi 12 Cpi 12 Elbow Ø133x87 with mudhole Draught stabilizer Fig 1 Module chimney steel ...

Page 7: ...6 DIAGRAM 3 Diagram 3 Electrical diagram 400V 3 phase ...

Page 8: ...7 DIAGRAM 3 1 Diagram 3 1 Electrical diagram 230V 1 phase ...

Reviews: