background image

MODELS  T100  T150

T200  T250  T300

TYPICAL INSTALLATION

MOUNTING

(New Frame Construction)

CEILING JOIST

(16” centers shown)

ROUND DUCT*

GRILLE

(Install after

ceiling is

finished.)

MOUNTING

SCREW

GRILLE

SCREW

Blower factory-shipped

in horizontal

discharge position.

Mounting brackets

factory-shipped in

position for ½”

ceiling material.

ADDITIONAL

1½” FRAMING

MOUNTING

(Existing Frame Construction)

TYPICAL INSTALLATION

WIRING

WIRING

PLATE

WHITE

TO

WHITE

BLACK

TO

BLACK

TOP / BACK

OF HOUSING

120 VAC LINE IN

GROUND TO

WIRING PLATE

ROUND DUCT*

GRILLE

SCREW

FINISHED

CEILING

MATERIAL

GRILLE

(Polymeric shown)

CEILING JOIST

(16” centers

shown)

2 X 4 FRAMING

(wide side down)

MOUNTING
BRACKETS
(Attached to

opposite sides

of housing &

upside-down,

so housing is

flush with

finished ceiling)

DUCTING

(Horizontal blower discharge)

ROOF CAP

ROUND

ELBOW*

ROUND

DUCT*

WALL

CAP

IMPORTANT:
Remove shipping tape from damper

Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork. Use
duct tape to make ductwork connections secure and air-tight.

Remove shipping ring from blower inlet

Remove the shipping ring from the blower inlet before operating
the ventilator.

* T100 & T150 use 6” round duct.

T200, T250 & T300 use 8” round duct.

* T100 & T150 use 6” round duct.

T200, T250 & T300 use 8” round duct.

Factory-shipped unit installed in new construction.

Ventilator can be wired from outside of housing. Use UL 
approved connectors to wire per local codes. 

Two ways to connect ductwork to a factory-shipped unit. 

Factory-shipped unit installed in existing construction.

Summary of Contents for T100

Page 1: ...en cutting or drilling into wall or ceiling do not damage elec trical wiring and other hidden utilities 6 Ducted fans must always be vented to the outdoors 7 To reduce the risk of fire use only metal ductwork 8 If this unit is to be installed over a tub or shower it must be marked as appropriate for the application and be connected to a GFCI Ground Fault Interrupter protected branch circuit 9 Neve...

Page 2: ...ite sides of housing upside down so housing is flush with finished ceiling DUCTING Horizontal blower discharge ROOF CAP ROUND ELBOW ROUND DUCT WALL CAP IMPORTANT Remove shipping tape from damper Remove the shipping tape from the damper flap and make sure that damper flap opens and closes freely inside the ductwork Use duct tape to make ductwork connections secure and air tight Remove shipping ring...

Page 3: ...ing nuts and carefully remove blower from housing Use appropriate vacuum attachment or a soft cloth and mild soap or detergent to clean blower discharge area and wheel DO NOT ALLOW WATER TO ENTER MOTOR Make sure blower assembly is completely dry before reinstalling Motor is permanently lubricated Do not oil or disassemble motor USE AND CARE Ventilator is designed for continuous operation If desire...

Page 4: ...eller under this warranty is limited to replacing repairing or issuing credit at cost F O B factory and at seller s discretion for any part or parts which are returned by buyer during such period provided that a seller is notified in writing within ten 10 days following discovery of such defects by buyer or within ten 10 days after such defects should reasonably have been discovered whichever is l...

Reviews: