Twiflex M1429 Instruction Manual Download Page 9

 

M1429 

Sheet 7 of 8 Issue 01 

February 2004 

 

NOTE

 

 

   

ON NO ACCOUNT SHOULD GREASE BE USED AS A MEANS OF  LUBRICATION. 

 
4.  

Ensure that the housing is square to the ram of the press and check that the block and sleeve 
assembly is square in the housing pocket. 

 
5.  

Insert block and sleeve assemblies into the housing pockets.  

 
6.  

After assembly check the squareness of the sleeve relative to the pocket.  All sleeve faces 
should be in line and parallel to each other. 

 

    

The couplings can be installed immediately after servicing, using the assembly methods 
already outlined.  

 

MAINTENANCE

  

 
1. 

Every 6 months (or planned maintenance)  

 

Carry out visual inspection of rubber blocks checking for signs of fatigue. 

 

NOTE 

 

Providing that good alignment is maintained then the rubber blocks will last for an 
indefinite period of time.   

 

On no account should attempts be make to replace individual layrub blocks.  If the blocks 
fail then they must be replaced as a complete set of block and sleeve assemblies.  

 

TROUBLESHOOTING

  

 
VIBRATION.  
 
   

Check condition of rubbers.  

   

Check alignment.  

   

Check concentricity of companion flanges and engine mounting.  

   

Check holding down bolts on gearbox and engine mounting.  

 

Summary of Contents for M1429

Page 1: ...M1429 INSTRUCTION MANUAL for REMOVAL AND INSTALLATION of BLOCK AND SLEEVE ASSEMBLIES for LAYRUB COUPLINGS...

Page 2: ...i AMENDMENT RECORD M1429 Amendment Number Issue Date Signature 01 February 2004...

Page 3: ...y suitable for the control of torsional vibration LAYRUB PRINCIPLE THE LAYRUB BLOCK The bore of the resilient block is reinforced by a high tensile steel wire screen formed from wire cloth wound tight...

Page 4: ...M1429 Sheet 2 of 8 Issue 01 February 2004 THE LAYRUB BLOCK...

Page 5: ...Layrub coupling is produced in various types and sizes each type being specially designed to fulfil a particular combination of operating conditions all the couplings have resilient blocks exactly as...

Page 6: ...cate that the coupling should be replaced Examine the bonding of the screen to the rubber and if failure at this point is apparent new block and sleeves should be fitted High operating temperatures ma...

Page 7: ...Issue 01 February 2004 Assembly of Resilient Block and Sleeve Unit Into an Open Pocket Housing RAM INVERTED SUPPORT RESILIENT BLOCK TO BE COATED WITH YELLOW COMMERICAL VASELINE BEFORE INSERTION INTO T...

Page 8: ...sue 01 February 2004 Assembly of Resilient Block and Sleeve Unit Into a Closed Pocket Housing RAM HOUSING VENTURI BLOCK SLEEVE RESILIENT BLOCK TO BE COATED WITH YELLOW COMMERICAL VASELINE BEFORE INSER...

Page 9: ...led immediately after servicing using the assembly methods already outlined MAINTENANCE 1 Every 6 months or planned maintenance Carry out visual inspection of rubber blocks checking for signs of fatig...

Page 10: ...y 2004 NOISE Check guard rubbing Check condition of rubbers RUBBER BLOCK FAILURE Check alignment SPARES Use only Layrub Block and Sleeves available from Twiflex Ltd 104 The Green Twickenham Middlesex...

Reviews: