
6
TP15KCX
Feb 2017
Fig. 3
(Column / Floor Layout)
1
OVERHEAD OBSTRUCTIONS: The area where the lift located should be free of overhead
obstructions such as heaters, building supports, electrical lines etc. (Figs 2 & 3.)
2
DEFECTIVE CONCRETE: Visually inspect the site where the lifts will be installed and check for
cracked or defective concrete.
3
FLOOR REQUIREMENTS: The lift should be installed on a 3000 PSI concrete with minimum of
4-1/4” thickness. The Floor should be level with-in gradients of
≦
1/4” within area of the two columns
= 148” x 35”).
(See Details for Foundation Anchoring Requirements & Anchoring Tips on Page 4)
Summary of Contents for TP12KFX
Page 6: ...4 TP15KCX Feb 2017...
Page 22: ...20 TP15KCX Feb 2017 POWER UNIT PRIMING...
Page 23: ...21 TP15KCX Feb 2017 EXPLODED VIEW 1...
Page 24: ...22 TP15KCX Feb 2017 EXPLODED VIEW 2...
Page 28: ...26 TP15KCX Feb 2017...