2.1
Safety Notes
l
All new autoclave users must undergo a period of training in proper usage
under an experienced employee.
l
Before initial use, check the autoclave chamber to ensure that no
packaging materials have been left inside.
l
Before use, check inside the autoclave chamber to ensure that no items
have been left from the previous cycle.
l
Always verify that you have chosen the appropriate sterilization program
l
After the cycle, open the door slowly to allow steam to escape and wait 20
seconds before you remove the load.
l
A certified inspector must perform a periodic pressure chamber safety test
according to the local regulations.
l
Once a year, or more frequently, effectiveness tests must be performed,
i.e., calibration and validation.
l
Make sure there are no leaks, breaks, blockages, whistles or strange
noises.
l
Perform maintenance operations as instructed. The owner of the
autoclave is responsible to perform the maintenance operations.
l
Notify the person in charge immediately of any deviation from the normal
functioning of the device.
l
Protective equipment and clothes and other safety instructions shall be
implemented in accordance with local and national regulations and/or
rules.
Page 16
Summary of Contents for AMS10-120-T
Page 2: ......
Page 4: ...https www tuttnauerusa com...
Page 16: ...1 10 Device Specifications 1 10 1 Device Overall Dimensions Page 9...
Page 55: ...Note For the results of the cycle see description in section 8 5 Page 48...
Page 66: ...Press to receive the entire printout of the selected cycle history Page 59...
Page 85: ...Page 78...