© Trynex International 2010 L1414
1— 15
Spreader Assembly Instructions
Model #TS85
Step 1:
Assemble upper handle assembly to lower axle support tube (see figure 1).
Step 2:
Insert rod into upper control handle as shown (figure 4).
Step 3:
Insert rod end into gate linkage and lock in place with hair pin clip as shown (figure 2).
Step 4:
Install deflector support bands onto hopper support tube as shown (figure 3). Continue by installing
deflector to support band on right side as shown (figure 3).
Figure 2
Figure 2
Figure 3
Figure 3
Figure 4
Figure 4
Figure 1
Figure 1
Clear protective cover
Step 5:
Attach clear protective cover on hopper.
R
Summary of Contents for TS-85
Page 7: ... Trynex International 2010 L1414 1 7 Main Assembly Views Model TS85 R ...
Page 9: ... Trynex International 2010 L1414 1 9 Complete Hopper Assembly Parts Breakdown Model TS85 R ...
Page 11: ... Trynex International 2010 L1414 1 11 Complete Axle Assembly Parts Breakdown Model TS85 R ...
Page 13: ... Trynex International 2010 L1414 1 13 Complete Handle Assembly Parts Breakdown Model TS85 R ...