6.3 

Operation

 

If the device is used in low demand mode, proof tests shall be executed periodically accord-

ing to T1.

 

Ensure that the plug connections and cables are always in good condition.

 

The device must be replaced immediately if the terminals are faulty or the device has any vis-

ible faults.

 

If cleaning is required, do not use any liquid or statically charging cleaning agent. Perform 

proof tests after each cleaning.

 

The proof test shall be executed each time after installation and parameterization in order to 

check the requested function.

 

The LED State is not part of the safety function.

 

The device must not parametrized during operation.

 

The proof test (see 

„9 Proof Tests“ on page 17

) shall be executed each time after installa-

tion and parameterization in order to check the requested function.

 

The device shall be locked against unintended operation/modification

6.4 

After operation

 

Undo the terminal connection on the device.

 

Remove the device from its rail fixing as shown in the figure:

Fig. 4:  Remove device

 

Ensure the proper disposal of the device.

Summary of Contents for 100030003

Page 1: ...Your Global Automation Partner Safety Manual IM X 18 DI03 4S 4T1R Isolating Switching Amplifier...

Page 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com Contents...

Page 3: ...8 5 2 Assumptions 8 5 2 1 FMEDA results 9 5 3 Examples of using this results 10 5 3 1 Probability of dangerous failure per hour High Demand Mode 10 5 3 2 Average probability of dangerous failure on de...

Page 4: ...4 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...

Page 5: ...any uncertainty in its interpretation Always refer to the English version of the safety manual or contact Turck directly 2 Scope This safety manual is valid for the following devices ID Productname Nu...

Page 6: ...puts SIL2 1oo1 Ex Ax Depending on the input signal and according to the configuration line monitoring effective direction the output assumes the safe state within 20 ms This leads to the opening of th...

Page 7: ...vice is granted a share of 10 of the respective failure limit value 10 100 IM Actuator Sensor This means that the failure limit value must be less than or equal 100 FIT PFH 10 7 h 1 4 4 PFD Average pr...

Page 8: ...safety related system with regard to the requirements of IEC 61508 Safety planning must only be carried out by trained and qualified personnel If there is any doubt contact Turck directly 5 1 Archite...

Page 9: ...The following safety characteristic are the results of the FMEDA According to the configuration inversion mode line monitoring the results of the FMEDA vary In this case the worst case configuration i...

Page 10: ...e http www turck com SIL or with the supplied SIL registration card This must be filled in with all required information upon receipt and sent to Turck The device must only be carried out fitted insta...

Page 11: ...st IP20 according to IEC 60529 at the mounting location Ensure that the electromagnetic stress does not exceed the requirements of IEC 61326 3 1 If there is a visible error e g defective housing the d...

Page 12: ...and Wiring Diagrams on page 16 Use cables with the following terminal cross section rigid 0 2 mm2 to 2 5 mm2 or flexible 0 2 mm2 to 2 5 mm2 When wiring with stranded wires Fix the wiring ends with fe...

Page 13: ...ll the screwdriver to fix the cable ends Fig 3 Connection with spring type terminals Make sure that only suitable equipment e g sensors are connected to the device see 7 Connection and Wiring Diagrams...

Page 14: ...output 1 2 3 and 4 The following table describes the cases for the execution of the safety function The relay output is within 20 ms de energized depending on the input signal and the parameterizsatio...

Page 15: ...g The proof test shall be executed each time after installation and parameterization in order to check the requested function The LED State is not part of the safety function The device must not param...

Page 16: ...U NAMUR BN BU BN BU NAMUR NAMUR BN BU 13 14 16 17 15 18 20 21 19 22 7 8 R1 R2 R1 R2 R1 R2 R1 R2 A1 A2 A3 A4 AErr E1 E2 E3 E4 GN Pwr 30 VDC 100 mA 30 VDC 100 mA 30 VDC 100 mA 30 VDC 100 mA 8 2 V 8 2 V...

Page 17: ...ex element using micro controlllers or programmable logic for details see 7 4 4 1 3 of IEC 61508 2 9 Proof Tests Proof tests shall be undertaken to reveal dangerous faults which are undected by diagno...

Page 18: ...turck com Certificate 10 Certificate These products are certified by SGS Saar for the use in safety related applications The certifi cate can be found under the following Link www turck com 11 Docume...

Page 19: ...19 V01 00 2021 10...

Page 20: ...100034219 2021 10 100034219 Over 30 subsidiaries and over 60 representations worldwide www turck com...

Reviews: