background image

Open Display Merchandisers are designed to be in an area that is ambient 80 degrees 
Fahrenheit (dry bulb) or colder with 55 percent relative humidity. If the installed unit is 
in a warm ambient area, it may not be as effective. Position the Merchandiser at its final 
location before removing the shipping skid. There are four bolts at the bottom of 
the merchandiser that secure the shipping skid. Remove all four bolts to remove 
the skid. Allow three inches of space from the wall to the back of the merchandiser. 
Condenser is located to the front. Do NOT block inlet. 

Four leveling legs are provided to level your Merchandiser. Use a leveler to ensure the 
unit is evenly leveled on all four corners. If the unit is not leveled correctly, excess water 
buildup will not drain properly. If you do not wish to use the levelers, they can be turned 
inwards. 

Prior to installation, the customer must check for damages with the freight company 
before the unit is accepted. 

1. lf the crate is damaged, make sure to note the damage on the Bill of Lading 

    prior to signing the delivery off. 
2. Concealed damage must be reported within 5 days of receiving the unit. Bill of   

    Lading must be faxed to the Claims department. Pictures of both unit and crating 

    may be requested. 

Reviews: