27
G
B
Connect the charging plug of the charger with the charging socket on the device.
Now plug the charger into the power socket. Charging will now start.
Charging is automatically stopped when the charge indicator on the charger lights up green.
It is not possible to over-charge the battery.
After charging is finished, first disconnect the charger plug from the power socket, then
the charging plug from the battery.
ATTENTION
In the case of prolonged storage, the battery may be destroyed. For this reason, observe
the following instructions when the device is not in use for a longer period of time (e.g. in
the winter months):
The battery must be fully recharged after each use. The maximum standstill time is 3
months, after which the battery must be recharged.
6.2 Quick closure valve/hose/spray lance
Figures 3 - 4
Push the hose up to the stop on the connection sleeve of the quick closure valve and
screw down with the coupling nut. Screw the spray lance onto the quick closure valve.
Then screw the required plastic nozzle (flat jet, Y-double cone, small/big shower) onto
the spray lance.
NOTE!
4 different plastic nozzles are included with the device for various applications. The
following table shows the output quantities of the nozzles, together with the spraying
angle and spraying pattern.
The nozzles were laboratory tested with a dynamic pressure of 2 and 3 bar.
Unscrew the safety cap on the hose connection
F
and push the hose up to the stop on
the connection sleeve of the hose connection
F
, then screw down tight with the cou-
pling nut.
4
3
1
2
Nozzle
Liters/minute
Dyn. pressure - 2 bar
Liters/minute
Dyn. pressure - 3 bar
Spray
angle
Spray
pattern
Presure at
Switch step II
2,12 l/min
2,5 l/min
approx. 90°
Shower
(small)
2,2 bar
2,26 l/min
–
approx. 70°
Shower
(big)
2,0 bar
1,43 l/min
1,72 l/min
approx.
85-90°
Hollow
cone
3,3 bar
1,42 l/min
1,65 l/min
approx.
95°-100°
Flat
spray
3,7 bar
RZ_TUKAN 1600E_DE.qxd:Text_EN 24.10.2014 12:07 Uhr Seite 27
Summary of Contents for 00012.0000
Page 3: ...A B C D E F I J K L M G H N O P RZ_TUKAN 1600E_DE qxd Umschlag2 28 10 2014 10 33 Uhr Seite 3...
Page 4: ...max 16 l 3 2 1 6 5 7 4 RZ_TUKAN 1600E_DE qxd Umschlag2 innen 28 10 2014 10 33 Uhr Seite 5...
Page 63: ...63 RU 1 2 TUKAN BVL 1 3 40 C 1 4 RZ_TUKAN 1600E_DE qxd Text_RU 24 10 2014 12 09 Uhr Seite 63...
Page 64: ...64 RU 1 5 2 2 1 16 TUKAN 1 10 RZ_TUKAN 1600E_DE qxd Text_RU 24 10 2014 12 09 Uhr Seite 64...
Page 65: ...65 RU 2 2 40 C 40 C 2 3 RZ_TUKAN 1600E_DE qxd Text_RU 24 10 2014 12 22 Uhr Seite 65...
Page 66: ...66 RU 2 4 V 0 C 45 C RZ_TUKAN 1600E_DE qxd Text_RU 24 10 2014 12 09 Uhr Seite 66...