![TTL TTL-ORBIS Assembly And Operating Instructions Manual Download Page 15](http://html1.mh-extra.com/html/ttl/ttl-orbis/ttl-orbis_assembly-and-operating-instructions-manual_1178890015.webp)
15
Air curtain systems ORBIS / TWIN
OR
L1 L2 L3
N N PE PE
PE PE
3-phase-alternative current connection
With all connecting modalities:
• Lead the power cables through one of the rubberised ducts.
• Remove the insulation of the cable ends.
• Stick the earth, neutral and positive cables into the correspondingly marked free connec-
tion points.
•
6WLFNWKHSKDVHFDEOHVSKDVHDQGDW25%,6/1;DQG7:,1
OR
LQWRWKH
correspondingly marked free connection points.
•
&KHFNWKDWDOOFRQQHFWLRQVDUHFRUUHFWO\LQSODFH
•
1RZ VHW XS WKH SRZHU VXSSO\7KH SLORW ODPS /(' RQWKH FLUFXLW ERDUG PXVW QRZ EH
blinking. If the status is permanent illumination or OFF, there is a problem with the bus
FRPPXQLFDWLRQ3URFHHGDVSHUSRLQWLQWKHWDEOHRQIDXOWDQDO\VLVVHFWLRQS
LED
LED on main board
• Switch off the power again and then close the cover plate and air intake grate.