TTL Torluftschleier TTL-AVANTGARDE Assembly And Operating Instructions Manual Download Page 1

TTL-TWISTO

TTL-AVANTGARDE
TTL-ORA

TTL-SAMUM

TTL-VIRADO

Design air curtain systems

Assembly and operating instructions

Translated English version

Summary of Contents for TTL-AVANTGARDE

Page 1: ...TTL TWISTO TTL AVANTGARDE TTL ORA TTL SAMUM TTL VIRADO Design air curtain systems Assembly and operating instructions Translated English version...

Page 2: ...e 3 4XDOL FDWLRQ RI SHUVRQQHO HQHUDO VDIHW LQIRUPDWLRQ 6FRSH RI GHOLYHU DFFHVVRULHV 7UDQVSRUW SDFNDJLQJ VWRUDJH 5 Assembly 5 5 1 Mounting modalities 6 5 1 1 Preparation for assemblage type TWISTO 6 5...

Page 3: ...ty read this information very carefully Warning Risk posed by electrical voltage Risk of electric shock Avoid contact DUQLQJ 5LVN RI UH R QRW XVH DQ DLU OWHU LQ DLU FXUWDLQ V VWHPV ZLWK HOHFWULFDO KHD...

Page 4: ...rota ting parts These can cause very serious personal or material damage Never open the covers during operation OZD V FXW RII WKH SRZHU VXSSO EHIRUH RSHQLQJ VZLWFK RII UHSDLU VZLWFK Caution Risk of bu...

Page 5: ...DW WKH OLIWLQJ HTXLSPHQW KDV VXI FLHQW ORDG EHDULQJ FDSDFLW Secure the unit against sliding and falling Do not walk beneath suspended parts Wear gloves when doing any work with or on the air curtain d...

Page 6: ...FUHZLQJ WKDW WKH DQJH DW WKH LQQHU HQG IDFH LV GHVLJQHG IRU ORDG suspension of the bracket That outside cup is an underpinning and an design element Assembly of brackets on air curtain case only with...

Page 7: ...UGHULQJ LQIRUPDWLRQ DQG LQ DJUHHPHQW LI VWDWLFO possible 7 TWISTO Installation of supply media sideways through the wall brackets LGWK RI XQLW FP 100 150 200 250 300 0HDVXUHV PP D TWISTO 5 8 1500 2000...

Page 8: ...HE 5 8 LNS HE 5 5 8 LNS HE only 5 8 100 cm 150 cm Only with TTL special bracket for ceiling mounting DQJH EUDFNHWV 200 cm 250 cm 6 6 67 6 300 cm 6 6 67 6 Warning Fire hazard posing by overheating OZD...

Page 9: ...ORA 100 205 ORA 200 1990 1960 205 ORA 250 1230 205 ORA 300 2990 2960 205 0RXQWLQJ PHDVXUHV FHLOLQJ IDVWHQLQJ 6 080 PP Types SAMUM 5 Height of case H 360 mm Type 2XWVLGH PHDVXUHV PP HLOLQJ PRXQWLQJ PP...

Page 10: ...326 159 VIRADO 100 1390 1390 0 326 159 VIRADO 200 1890 1890 0 326 159 VIRADO 250 2390 1000 695 326 159 VIRADO 300 2890 1000 326 159 0RXQWLQJ PHDVXUHV FHLOLQJ IDVWHQLQJ 9 5 2 YDULDELOLW 6 LQ PP 7 1 0...

Page 11: ...VOLGLQJ VWRQHV LQ FRUUHVSRQGHQFH WR WKH JXUH DW SDJH RQO W SH 9 17 5 6FUHZ WKH H SOLFLW QXPEHU RI WKUHDGHG URGV FD PP LQWR WKH VOLGLQJ VWRQHV VWUDLJKW WR WKH ERWWRP RI WKH JLUGHU VHFWLRQ W SH 9 17 5...

Page 12: ...ing brackets if not done by factory to the unit side attachments with the enclosed hexagon bolts M12 corresponding to the hints for Preparation for assemblage as per pt 5 1 Position the air curtain sy...

Page 13: ...DQG HDUQ WKH FRUH KROH WR FDUU WKH PHGLD FRQQHFWLRQV XQOHVV WKH PRXQWLQJ KDSSHQV QRW DW D KROORZ RRU DUQ VXEVWUDWXP DGHTXDWH PHWDOO GRZHOV LQWR WKH RRU LQ DFFRUGDQFH WR WKH VNHWFK DERYH 3XOO WKH XQLW...

Page 14: ...y at the face side resp stand side of the air curtain device corresponding to the hints for Preparation for assemblage as per pt 5 1 3XOO WKH XQLW ZLWK WKH SUHDVVHPEOHG VWDQG EDVH RYHU WKH PHWDO GRZHO...

Page 15: ...ter curcuit cool down for at least 30 minutes Heating and voltage connections are always situated opposite and depending on the design at the right or left side 0HDVXUHV IRU KHDWLQJ FRQQHFWLRQV W SH 9...

Page 16: ...Q PP 0HDVXUHV IRU KHDWLQJ FRQQHFWLRQV W SH 9 5 2 YDULDELOLW 6 LQ PP 1 Thread M8 for ceiling mounting 2 Air intake adapter incl filter foldable 3 Maintanance flap HDWLQJ FRQQHFWLRQV RQ WRS KHDWLQJ FRQQ...

Page 17: ...LGHZD V Screw the seal plugs on the open ports Prove leakproveness of the connections and seal plugs 7KH KHDWLQJ FRQQHFWLRQV RI WKH DLU FXUWDLQ V VWHP 7 672 LQWHUQDO WKUHDG DW 7 672 DQG LQWHUQDO WKUHD...

Page 18: ...YDOYH FRPSOHWH the requested entirely heating circuit Observe the circumstance that the 3 way valves are divider valves L WKH YDOYH KHDG FRQWUROOHU on the valve body WKUHDG 0 Lever out the blind plug...

Page 19: ...y touching an earthed object Heating and voltage connections are always situated opposite and depending on the design at the right or left side with type TWISTO at the same side resp below or overhaed...

Page 20: ...ift up the air intake grate DQG WKH PDLQWHQDQFH DS IRU DQ JDS DQG SXVK WKH safety catch in relieved situation slightly back Unhook the safety catch out of the notch and open the air intake grate fully...

Page 21: ...WKH IDVWHQLQJ VFUHZV 2SHQ WKH FRYHU SODWH RI WKH HOHFWURQLF XQLW ZLWK D 3KLOOLSV VFUHZGULYHU 5 3 1 RQQHFWLRQ WR WKH FRQWURO XQLW GDWD OLQH Lead the data cable through one of the rubberised ducts 6WLF...

Page 22: ...TWISTO resp VIRADO standing variabilities through the stand base or the base plate or the brackets Remove the insulation of the cable ends Stick the earth neutral and positive cables into the correspo...

Page 23: ...ic shock The OFF button on the operating console does not interrupt the power supply Before assembly maintenance and servicing work the repair switch must be switched to OFF 8 KDQJLQJ WKH DLU OWHU DUQ...

Page 24: ...LQIRUPHG Fault Possible cause Remedy 1 LED on circuit board is not blinking Jumper is incorrectly inserted to the right beside the data connections 1 connection insert jumper 2 connections remove jum...

Page 25: ...this decla ration shall lose its validity Product designation Air curtain systems AVANTGARDE TWISTO ORA SAMUM VIRADO Model designation TWISTO 200 N LNS 3HUIRUPDQFH FODVV 16 HDW H FKDQJHU 1 17 1 2 9 HY...

Page 26: ...Air curtain systems AVANTGARDE TWISTO ORA SAMUM VIRADO 26...

Page 27: ...Air curtain systems AVANTGARDE TWISTO ORA SAMUM VIRADO...

Page 28: ...TTL Torluftschleier GmbH Fabrikstra e 3 73650 Winterbach Fon 49 0 71 81 40 09 0 Fax 49 0 71 81 40 09 10 info luftschleier de www luftschleier de...

Reviews: