![TTI FABRICATION ECOLO 50 Installation And Operation Manual Download Page 9](http://html1.mh-extra.com/html/tti-fabrication/ecolo-50/ecolo-50_installation-and-operation-manual_1178845009.webp)
9
SALT CHLORINATORS
Salt chlorinators are made to be installed as inline chlorinators. Therefore, they must be installed as prescribed in the
section above (“inline chlorinator or brominator”).
PRESSURIZED CHLORINATOR OR BROMINATOR
Pressurized chlorinators or brominators start by using a small quantity of water as it exits the filter, then add chemicals
and forward this highly concentrated solution into the pool. Check valves must therefore be extremely resistant to
corrosion. Only use the valves that have been supplied or recommended by the manufacturer of your chlorinator or
brominator.
CONNECTION TO ELECTRICAL POWER
To ensure your safety and the proper functioning of the device, the electrical connections must be performed by a
qualified electrician according to national codes, provincial and local regulations.
A circuit breaker must be installed close to the heat pump, in an accessible location.
Never open the electrical box without shutting off the power to all sources used for the operation of the heat pump. If
your heat pump has a pool pump control option, remember to close the circuit breaker to this pump.
The spec sheet for the heat pump contains all the requirements for voltage and amps.
If the power cord is damaged, it must be replaced by a qualified electrician.