background image

1)  Opening arms

㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌 㻌

2) Removing or attaching arms

㻌 㻌 㻌 㻌 㻌 㻌 㻌

3) Closing arms 

Attach vertical dividers when filling your Cableveyor with cables & hoses. 
With the arms open, attach the vertical dividers as follows. 
1.  Hook  one  of  the  catches  on  the  end  of  the  vertical  divider  into  the  link. 

(circled red in photo on right) 

2.  Snap in the other catch by pushing the divider down in the direction of the arrow. 

*Either end of the vertical divider can be used. 
*Insert horizontal dividers into the vertical divider holes first, and then attach the unit 
to the link. (Note: This will require more than one vertical divider.)

Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s 
performance graph then there will be no problems with use. 

1.  Machine travel end installation height (H’) should be 

Cableveyor height H + (10-30). 

2. 

Cableveyor space height (h) is H + 100. 

3. 

Install a guide rail. 

4. 

The  difference  (

İ

)  in  the  travel  end  and  fixed  end 

bracket attachment sides should be less than 4mm.   

5. 

Use travel cables/hoses with excellent bending and 
wear properties. 

6.  Avoid using cables/hoses with wire braiding, as they 

are easily damaged. 

7.  Cables/hoses wear easily when used stacked onto 

of  one  another.  Lay  horizontally  or  use  horizontal 
dividers. 

8.  Set  cables  and  hoses  in  the  Cableveyor  so  that 

they have some play, and clamp both ends. 

9.  Remove  foreign  objects  from  guide  rails,  as  they 

may cause damage. 

10.  The  following  are  shipped  unassembled  and  will 

require assembly when installing the Cableveyor. 

z

 

(Moving/fixed end) plastic brackets 

z

 

Vertical/horizontal dividers 

Any  unevenness  on  the  plastic  bracket  installation  surface  may  damage  the  bracket.  Ensure  that  the  installation 
surface is as smooth as possible. Over-tightening the installation bolts can also damage the plastic bracket. Please use 
the following recommended tightening torque. 

Bolt Size 

Recommended Tightening Torque 

M6 

2.6 N

Opening and Closing Arms

Attaching Dividers 

7 Cautions When Handling 

Issued  February  4,  2013  ©Tsubakimoto  Chain  Co.

2

1

Vertical 

Divider 

Remove 

Attach 

Vertical divider 

Hole for horizontal divider 

Horizontal 

divider

Insert a flat-head screwdriver 

into the gap between the arm 

end  and  link  and  twist  to 

open. 

With the arm at 90º, move in 

the  direction  of  the  arrow  to 

remove. 

Reverse 

the 

process to attach. 

Press  the  end  of  the  arm 

down  by  hand  or  tap  lightly 

with a plastic hammer until it 

audibly snaps into place.   

50mm or over 

50mm or over 

Guide rail (Cableveyor cradle) 

Reviews: