5
Chapter 1
Set Up
This chapter guides you through unpacking, setting up, and getting
started using your A
CCU
B
ALANCE
. See Chapter 2 for a detailed
description of all operating features.
Unpacking
Carefully unpack the instrument and accessories from the carrying
case. Check the individual parts against the list of components in
Table 1. If any are missing or damaged, notify TSI immediately.
Table 1. List of components
Qty Item
Part
No.
1
Model 8370 base
1081388
1
2 ft x 2 ft (610 mm x 610 mm) hood fabric 1307060
6
Frame support poles
1081390
4
2 ft (610 mm) frame tubing* 1081262
6
Right angle tubing connectors* 1081584
1 Battery
holder
1081279
4 C-size
batteries
1208018
1
Battery compartment cover
1081458
1 Carrying
case
1319067
1
Operation and Service Manual
1980145
*Four 2 ft frame tubings and four of the right angle connectors are
shipped assembled inside the top of the hood fabric.
Summary of Contents for AccuBalance 8370
Page 2: ......
Page 8: ...iv...
Page 10: ...2 About this manual...
Page 12: ...4 Introduction...
Page 26: ...18 Chapter 1...
Page 56: ...48 Appendix D...
Page 58: ...50 Appendix E...