Nova Connect Assembly Instructions
–
Rev B
Page 7
4.
POWER BOX AND CABLING INSTALLATION
•
Install Utility box by loosening the T-Nuts, insert T-Nuts to
the extrusion channel, slide box up or down to desired
height and tighten screws.
•
Open box by using Torx Security L-Key, loosen two (2)
screws from the back of the Power Box until door swings
open.
•
Install 9’ Green Dot Hospital Grade Power
Extension Cable
as shown (see middle image).
•
Install
tablet’s power
cable through hole and up the
channel as shown.
•
Close door back in place and re-install the screws from
back.
STORING THE POWER CORD
When the cart is not in use, or device is not being charged, the
extension cord should be wrapped and stored on the unit. Wrap
the cable firmly around the upper and lower cord wraps located
on the back of the unit pole.