![tryten Nova Connect-O Assembly Instructions Manual Download Page 27](http://html1.mh-extra.com/html/tryten/nova-connect-o/nova-connect-o_assembly-instructions-manual_1177676027.webp)
Nova Motion/Tall/Connect-O Assembly Instructions
–
Rev A
Page 27
25.
JBL CHARGE 4/5 AND FLIP 4/5
–
BRACKET & SPEAKER
INSTALLATION
•
Remove channel cover strip (ref. point 4).
•
Install JBL Charge bracket to extrusion with two (2) screws
and two (2) Z-nuts.
•
Remove screws and cap using Torx Security L-Key
provided.
•
Install speaker by sliding speaker ledge into bracket lip.
•
Re-install cap and screw using Torx Security L-Key
provided.
26.
HANDLE INSTALLATION (Optional Accessory)
•
Install Handle by loosening T-Nut, insert T-Nut into
extrusion channel, slide handle up or down to desired
height and tighten screw.
•
Press protective plastic cap on to end of screw head.