AV30 PRE-INSTALLATION REQUIREMENTS | AV30 Pre-Installati on Requirements | v. 3.0
18 / 37
STAGE 4: CONTROL PANEL WIRING
Technical Documents
·
Helpful Links & Important Information
Your electrician should provide you with all the wiring and conduit.
Contact Aqua Sierra for Support, Call: 530.823.3241
SEE CONTROL PANEL REQUIREMENTS CHECKLIST
AutoVap30 System Startup
WARNING!
DO NOT TURN ANY POWER ON BEFORE CHECKING
VOLTAGE AND MEASURING TERMINAL RESISTANCE
Tools Needed
·
Volt/Ohm multimeter
·
Small terminal block screwdriver
·
Standard flat head screwdriver
·
½” wrench
·
⅝” wrench and/or ⅝” ratchet and socket
·
⅞” wrench
·
13/16” wrench
·
Wire strippers
·
Crescent wrench
Check for loose connections
Start by checking the wire connections made inside the Operator Panel(HMI) and in the PLC cabinet.
Pull softly but firmly on each of the wires for the 24v inputs and for VFD motor leads.
Reconnect any loose wires.
Measure terminal resistance of the 3 motors (inside the PLC cabinet)
Using a multimeter, measure the resistance(ohms) of the terminals to make sure that the motors are
landed correctly in the junction box.