−
The lift gate opens.
−
The storage cart enters with the requested pallet.
−
The lift gate closes.
8. Press
Check inventory
. All available stocks are displayed.
9. Press
Store back-up
. The pallet at the BendMaster storage
station returns to the storage system.
Sequence
−
BendMaster automatically moves into parking position.
−
The lift gate opens.
−
The storage cart departs with the pallet.
−
The lift gate closes.
10. Press
Abort
.
All positions are deleted in the control.
11. Re-book all positions by means of a manual travel to stor-
age.
Moving a storage cart in automatic mode
Optionally, single jobs (single order operation) or entire produc-
tion plans with store connection can be executed automatically
(see "Production planning", pg. 4
If a job or production plan is started, the control checks whether
the required raw material is in the production cell.
The control also checks whether the finished parts are to be
booked to the storage system. An empty pallet is requested from
the storage system if necessary.
■
The storage control is notified about the activated travel
order.
■
The BendMaster moves into parking position.
■
The storage pallet is reserved by the storage system.
■
The BendMaster releases the pallet.
■
The storage system disables the pallet and sends the "Open
gate" request.
■
The BendMaster control opens the lift gate. The pallet is
moved into or out of the production cell.
■
The gate is closed.
■
The storage system releases the pallet again.
4
‐
108
Running in a TruTops program
2015-06-01
B579EN
Checking the stock
Returning to storage
Aborting the travel to
storage
Sequence
Summary of Contents for BendMaster 150
Page 1: ...Operator s manual BendMaster TruBend Cell 5000...
Page 2: ......
Page 3: ...Operator s manual BendMaster TruBend Cell 5000 Original operator s manual Edition 2015 06 01...
Page 6: ...II Before you proceed 2015 06 01 B579EN...
Page 16: ...0 10 Table of contents 2015 06 01 B579EN...
Page 44: ...1 28 Disassembly and disposal 2015 06 01 B579EN...